05/04/2026
The CAVITEX-CALAX Link (CCLink) Road 1 at the Kawit Exit Ramp (after Kawit Toll Plaza, heading toward Zeus Intersection) will be temporarily open from April 6 to April 15, 2026 to give way to construction works on CCLink Road 2.
Please follow the designated diversion routes.
Traffic signs will be installed in strategic areas to guide motorists, and traffic marshals will be on-site to assist and ensure smooth traffic flow.
Thank you for your patience and cooperation.
Drive safely!