18/06/2023
The Malolos-Manila and the Clark Extension are components of the NSCR Project formerly known as the Clark–Calamba Railway. NSCR is a 163-kilometer urban rail transit system designed to provide more sustainable transportation, reduce travel time, and allow greater connectivity between Central Luzon and CALABARZON.
NSCR Malolos-Manila which runs from Tutuban (Manila) to Malolos City, Bulacan has a total length of 38 kilometers and costs PHP149.13 billion. Groundbreaking for the project was held in February 2019. As of 31 January 2022, the project had a physical accomplishment of 55.42 percent.
“The trip from Tutuban, Manila to Malolos, Bulacan, which previously took more than an hour, is expected to take only 30-35 minutes.”
Altana Subdivision is only 5-8 minutes away from the Malolos Station of the Manila-Clark Railway.
Contact us now to get a price quote or to schedule a site visit!
Posted on March 14, 2022 Engr. Rolando Soriano and Engr. Rafael Esguerra, representatives of the Department of Transportation (DOTr), confirmed that the North-South Commuter Railway (NSCR) Malolos-Manila and Clark Extension will be finished in 2024. This was the report of DOTr during the meeting of....