08/05/2021
The Malolos - Clark railway project is set to start its construction simultaneous with the Malolos - Tutuban railway, both promising 35 minutes travel time.
Wellford Homes is approximately 15 minutes drive from the proposed Malolos LRT station. The convenience is so imaginable 😊
Be one of our soon to be LOT or HOUSE & LOT owner by availing any of these limited time offer:
🔹Reserve for as low as 10k
🔹Flexible monthly DP for 36 months, 0%
🔹Monthly DP discount until December 31, 2020
🔹Loan financing through accredited banks, NHM and Pag-Ibig
Send us a DM to know more 😊