19/05/2023
For Property Viewing, Beach Lot Computation
For Actual or Virtual Tour Presentation
Feel Free to Message or Call
Tine Espiritu
09260332877
PROPOSED INTER-ISLAND BRIDGE IN LUZON FEATURED AT ADB MEET IN INCHEON, SOUTH KOREA.
Korean construction and engineering companies are interested to participate in the procurement of the design and build of a mega inter-island bridge project in Luzon.
The Bataan-Cavite Interlink Bridge Project is being developed by the DPWH Unified Project Management Office โ Roads Management Cluster 2 (Multilateral) with technical assistance funding from the ADB to advance the detailed engineering design with the DED contract awarded to the joint venture of TY Lin International and the Republic of Koreaโs Pyunghwa Engineering Consultants, working with Switzerland-based Renardet and the Philippinesโ DCCD Engineering Corporation.
The Bataan-Cavite Interlink Bridge Project includes the construction of two cable-stayed navigation bridges on either side of historic Corregidor Island.
New opportunities will be created by the Bataan-Cavite Interlink Bridge Project, including the development of seaports in the two (2) provinces of Bataan and Cavite, making them potential international shipping gateways of the country.
Once completed, the inter-island bridge which will be one of the longest bridges in the Philippines and the world will cut travel time between Bataan and Cavite from the current five (5) hours to 45 minutes.
ctto: Department of Public Works and Highways