ITC CORP.

ITC CORP. Your Pro Design & Construction Partner:
PCAB-Licensed Category A
General Building + General Engineering
Platinum PhilGEPS Certification Smart IoT Automation
5.

Your Smart Design + Build Partner

ITC CORP. is an end to end Architectural and Engineering Design, General Constructor Firm, licensed by the Philippine Constructors Accreditation Board (PCAB) Category A with a Platinum PhilGEPS Certification. We provide the following services.

1. Architectural, Interior, and Structural Design
2. General Construction and Interior Fit Out
3. Mechanical, Electric

al, Plumbing, Fire Protection,
4. Auxiliary Systems Integration

To find out more about our company, connect with us here: https://msha.ke/itccorp


DID YOU KNOW? We are a social enterprise with a mission to provide sustainable livelihood for the urban poor, aid in church building projects as well as the use of sustainable materials and construction methodologies.

12/05/2026

๐’๐“๐’ (๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ #๐Ÿ‘๐ŸŽ๐Ÿ”): One of our classrooms is now around 80% complete. With generous ceiling height and a well-planned layout, the space already feels brighter, cooler, and more comfortable. A great reminder that thoughtful design can make a big difference in how a space feels.

STS 2: 2+2 Storey School Building in Metro Manila 2+2 Floors with 11 + 8 Classrooms (Plus 11 other rooms) (Build)

STS 2 (Project  #306): STS 2: 2+2 Storey School Building in Metro Manila 2+2 Floors with 11 + 8 Classrooms (Plus 11 othe...
11/05/2026

STS 2 (Project #306): STS 2: 2+2 Storey School Building in Metro Manila 2+2 Floors with 11 + 8 Classrooms (Plus 11 other rooms) (Build)

๐‡๐จ๐ฐ ๐๐จ๐ž๐ฌ ๐ž๐ฏ๐ž๐ซ๐ฒ๐ญ๐ก๐ข๐ง๐  ๐œ๐จ๐ฆ๐ž ๐ญ๐จ๐ ๐ž๐ญ๐ก๐ž๐ซ ๐Ÿ๐ซ๐จ๐ฆ ๐š๐›๐จ๐ฏ๐ž?

From above, overall form come together showcasing how planning and ex*****on align on site.
Share your insights or experiences in managing cosntruction workflows below!

09/05/2026

๐๐Ÿ๐” (๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ #๐Ÿ๐Ÿ—๐Ÿ’): Second floor progress, classrooms nearly ready for turnover. Just a bit of cleaning left and these spaces are good to go. Inside, finishes are complete, clean white walls, subtle accent tones, and client provided chairs and tables already in place. With louvers on both sides, cross ventilation keeps the rooms comfortable, no need for air conditioning when fans are on.

P1U: Phinma Union College of Laguna 4+3 floors with 16+12 classrooms (Plus 8 other rooms) (Build)

COF (Project  #312): CCF East Ortigas (Build)๐…๐ซ๐จ๐ฆ ๐œ๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐ฌ๐ข๐ญ๐ž ๐ญ๐จ ๐ฌ๐š๐œ๐ซ๐ž๐ ๐ฌ๐ฉ๐š๐œ๐ž, ๐œ๐š๐ง ๐ฒ๐จ๐ฎ ๐Ÿ๐ž๐ž๐ฅ ๐ญ๐ก๐ž ๐๐ข๐Ÿ๐Ÿ๐ž๐ซ๐ž๐ง๐œ๐ž?From co...
06/05/2026

COF (Project #312): CCF East Ortigas (Build)

๐…๐ซ๐จ๐ฆ ๐œ๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ๐ฌ๐ข๐ญ๐ž ๐ญ๐จ ๐ฌ๐š๐œ๐ซ๐ž๐ ๐ฌ๐ฉ๐š๐œ๐ž, ๐œ๐š๐ง ๐ฒ๐จ๐ฎ ๐Ÿ๐ž๐ž๐ฅ ๐ญ๐ก๐ž ๐๐ข๐Ÿ๐Ÿ๐ž๐ซ๐ž๐ง๐œ๐ž?

From construction site to completed worship center, it is now a place where people gather, reflect, and grow in faith.

05/05/2026

We're thrilled to share this heartwarming interview with one of our valued clients. Hear firsthand about their experience working with us and their thoughts on the results of their project.

Your satisfaction is our greatest reward, and moments like these inspire us to keep creating exceptional spaces. Thank you for trusting us with your vision.

What would you build with us next? Drop your dream project in the comments below!

04/05/2026

CBB (Project #296): 10 meters down and the work gets tougher.

As we encounter harder rock layers, we adjust our approach by switching to an auger for deeper pe*******on. Slurry supports the excavation process and is recycled to maintain efficiency on site.

This is what it takes to build from the ground up.

CBB: The Chancery Bacolod, A 9 Storey Mixed-Use Bldg, Bored Piling Works (Build)

SL1 (Project  #291): Concrete Paving of Sitio Lagha, Brgy. Quezon Road, San Carlos City, Negros (Build) ๐–๐ก๐š๐ญ ๐ž๐ง๐ฌ๐ฎ๐ซ๐ž๐ฌ ๐š ๐ฌ...
02/05/2026

SL1 (Project #291): Concrete Paving of Sitio Lagha, Brgy. Quezon Road, San Carlos City, Negros (Build)

๐–๐ก๐š๐ญ ๐ž๐ง๐ฌ๐ฎ๐ซ๐ž๐ฌ ๐š ๐ฌ๐ญ๐š๐›๐ฅ๐ž ๐›๐š๐ฌ๐ž ๐›๐ž๐Ÿ๐จ๐ซ๐ž ๐œ๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง?

Grading of base in progress establishing proper levels and compaction to support the next phase of construction and ensure long-term stability.

Today, we honor the hands that bring visions to life, turning plans into progress and foundations into futures.At ITC CO...
01/05/2026

Today, we honor the hands that bring visions to life, turning plans into progress and foundations into futures.

At ITC CORP, we recognize that every structure stands on the dedication, skill, and grit of our people.

Happy Labor Day.

PAF 2 (Project  #320): Alabang Luxury Townhouses Phase 2 (Build) ๐–๐จ๐ฎ๐ฅ๐ ๐˜๐จ๐ฎ ๐“๐ซ๐ฎ๐ฌ๐ญ ๐š ๐‚๐ž๐ข๐ฅ๐ข๐ง๐  ๐–๐ข๐ญ๐ก๐จ๐ฎ๐ญ ๐๐ซ๐จ๐ฉ๐ž๐ซ ๐…๐ซ๐š๐ฆ๐ข๐ง๐  ๐…๐ข๐ซ๐ฌ๐ญ?...
30/04/2026

PAF 2 (Project #320): Alabang Luxury Townhouses Phase 2 (Build)

๐–๐จ๐ฎ๐ฅ๐ ๐˜๐จ๐ฎ ๐“๐ซ๐ฎ๐ฌ๐ญ ๐š ๐‚๐ž๐ข๐ฅ๐ข๐ง๐  ๐–๐ข๐ญ๐ก๐จ๐ฎ๐ญ ๐๐ซ๐จ๐ฉ๐ž๐ซ ๐…๐ซ๐š๐ฆ๐ข๐ง๐  ๐…๐ข๐ซ๐ฌ๐ญ?

Painting works preparation and ceiling framing installation in progress ensuring proper surface readiness and accurate alignment before finishing.

28/04/2026

Arch. Mhykee teaching his son on site ๐Ÿ”๐Ÿ‘ทโ€โ™‚๏ธ
โ€˜Check the spacing, inspect it well, and only say โ€œapprovedโ€ when itโ€™s perfect.โ€™ A moment showing how quality work starts with careful attention.

COF (Project  #312): CCF SM East Ortigas (Build)๐–๐ก๐š๐ญ ๐ฆ๐š๐ค๐ž๐ฌ ๐š ๐ฐ๐จ๐ซ๐ฌ๐ก๐ข๐ฉ ๐ฌ๐ฉ๐š๐œ๐ž ๐ญ๐ซ๐ฎ๐ฅ๐ฒ ๐œ๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž?What was once a construction s...
27/04/2026

COF (Project #312): CCF SM East Ortigas (Build)

๐–๐ก๐š๐ญ ๐ฆ๐š๐ค๐ž๐ฌ ๐š ๐ฐ๐จ๐ซ๐ฌ๐ก๐ข๐ฉ ๐ฌ๐ฉ๐š๐œ๐ž ๐ญ๐ซ๐ฎ๐ฅ๐ฒ ๐œ๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž?

What was once a construction site is now a place where people gather, reflect, and grow in faith. This worship center stands as a space for community, purpose, and spiritual connection

Address

Suite 506. OMM-Citra Building, San Miguel Avenue, Ortigas Center
Quezon City
1605

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm
Saturday 9am - 6pm

Telephone

+639189216210

Website

https://msha.ke/itccorp

Alerts

Be the first to know and let us send you an email when ITC CORP. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ITC CORP.:

Share