12/08/2026
🚨 BAKIT MO PA PALALAYUIN ANG PANGARAP MO KUNG MAS ACCESSIBLE NA ITO? 🏡
SARILING BAHAY NA.
MALAPIT SA KAILANGAN MO.
CONNECTED SA MGA LUGAR NA MAHALAGA SA’YO.
Welcome to NEXTASIA BARCELONA — San Pablo, Laguna.❤️
📍 Near schools & hospitals
🛒 Minutes away from groceries & malls
🛣️ Strategically located near the TR4 Project
🏘️ 22-hectare European-inspired community
🌳 May spaces for recreation, community & family living
At habang patuloy na nade-develop ang infrastructure sa paligid, mas nagiging accessible ang San Pablo sa mga karatig-lugar.
Hindi lang bahay ang binibili mo.
Binibili mo ang convenience.
Binibili mo ang location.
Binibili mo ang future ng pamilya mo.
🔥 Kung naghahanap ka ng bahay na practical ngayon at may potential para sa future, baka NEXTASIA BARCELONA na ang hinahanap mo.
📩 MESSAGE ME “NEXTASIA” NOW
at alamin ang available house options at payment terms.
ELLIE RAVELO
09243962081
GOODBYE, LONG DRIVES?
Department of Transportation (DOTr) Secretary Banoy Lopez shared in an interview that a portion of the South Luzon Expressway Toll Road 4 (SLEX TR4), from Package A to Package C, will be operational by December.
The SLEX TR4 is a project of the DOTr in coordination with the Department of Public Works and Highways.
From the usual travel time of two hours, the trip for motorists from Sto. Tomas, Batangas to Tiaong, Quezon, and vice versa, will now take as little as 30 minutes.
Lopez added that once the SLEX TR4 is completed, the travel time from Batangas to Lucena will be slashed from four hours to just an hour!
“By end of this year, we can start using the TR4. Mai-inaugurate po natin ‘yan. Ang target natin diyan mga November, December start of operations of TR4. Ang usual travel time po natin diyan [para sa buong TR4] is four hours. Once mabuksan na po natin ang [buong] TR4 natin, magiging isang oras na lang po,” Lopez elaborated.
Upon completion, the SLEX TR4 is projected to serve around 17,000 motorists daily.
Photo from San Miguel Corporation