Journey of the Making of LakeVille in Pictures

Journey of the Making of LakeVille in Pictures City Living by the Lake Please hit LIKE if you find anything useful or interesting here!

A resident of LakeVille myself, I found enough spare time to document the construction progress of it in pictures across a span of 2 years. And please go to www.facebook.com/lakeville.sin to friend me if you are a resident of LakeVille!

Google Map Street View documenting LakeVille taken from the same spot/angle 1 year apart.
15/02/2017

Google Map Street View documenting LakeVille taken from the same spot/angle 1 year apart.

The lighted signage post at the Grand Entrance directing visitors to wards the basement carpark.
13/02/2017

The lighted signage post at the Grand Entrance directing visitors to wards the basement carpark.

The final max height limit is 2.3m (instead of 2.2m as earlier posted). The centre divider of the ramp is made of just r...
13/02/2017

The final max height limit is 2.3m (instead of 2.2m as earlier posted). The centre divider of the ramp is made of just reflector studs, which I wish it should have been concrete island to be safer as it is a curve down.

The barrier has flashing LED to caution drivers.
13/02/2017

The barrier has flashing LED to caution drivers.

Directional signs are marked at the roundabout of the Grand Entrance.  But, is the left turn sign correct?  Turning left...
13/02/2017

Directional signs are marked at the roundabout of the Grand Entrance. But, is the left turn sign correct? Turning left will lead to a dead end (the gate to the Bin Centre).

All ready and good to go.  The LAKEVILLE sign at the Grand Entrance re-installed, now added the addresses.
10/02/2017

All ready and good to go. The LAKEVILLE sign at the Grand Entrance re-installed, now added the addresses.

The completed and operationally ready security guard house (and management office at the back)
10/02/2017

The completed and operationally ready security guard house (and management office at the back)

The commercial units at the Grand Entrance. The glass panels are fixed with LakeVille decals. The glares and heat of the...
10/02/2017

The commercial units at the Grand Entrance. The glass panels are fixed with LakeVille decals. The glares and heat of the afternoon sun can be very annoying even the glass panels are heavily tinted, but should improve when Lake Grande towers are erected blocking most of it. Notice the reflection of the sun on the glass through the awning?

The gated entry points at the Grand Entrance. With the security guard post 1 unit away, I am wondering how effective wil...
10/02/2017

The gated entry points at the Grand Entrance. With the security guard post 1 unit away, I am wondering how effective will be the security and how visitors are being usher into the estate.

The Grand Entrance, centered with a directory that guides visitors to the respective block. I wish there were benches fo...
10/02/2017

The Grand Entrance, centered with a directory that guides visitors to the respective block. I wish there were benches for me to sit while waiting for my ride to come.

The lit LAKEVILLE sign at the side-gate.
26/01/2017

The lit LAKEVILLE sign at the side-gate.

Grand Entrance by night, with the newly installed LakeVille sign lit at the foreground and the roundabout water feature ...
26/01/2017

Grand Entrance by night, with the newly installed LakeVille sign lit at the foreground and the roundabout water feature lighted up at the back. (Note the word "LAKE" is back-lit and "VILLE" is box-light)

Address

11 Jurong Lake LInk
Jurong Town
648155

Alerts

Be the first to know and let us send you an email when Journey of the Making of LakeVille in Pictures posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Journey of the Making of LakeVille in Pictures:

Share