Pinnacle Projects & Development Atara, our brand new development offers ultra modern living spaces, with breathtaking ocean views.

Villa B5 is almost ready for handover, with only the final finishing touches and quality checks remaining.    Everything...
11/06/2026

Villa B5 is almost ready for handover, with only the final finishing touches and quality checks remaining.

Everything is coming together well, and the villa is looking great. 🏡👷🏽‍♂️✅

Villa A2 has now been successfully handed over to the client. We’re delighted with the finished result, and most importa...
08/06/2026

Villa A2 has now been successfully handed over to the client. We’re delighted with the finished result, and most importantly, the client is extremely happy with their new villa. Thank you to everyone involved for helping make the project a success. 🔑 🏡 🌴 😎

Maenam villa project is now back on track after a brief pause, with strong progress continuing across all areas. 📋✅😎🌴☀️C...
12/05/2026

Maenam villa project is now back on track after a brief pause, with strong progress continuing across all areas. 📋✅😎🌴☀️

Current works include finishing details, eaves and soffits installation, air conditioning works, skim coating, and painting as the project moves closer towards completion. 👷🏽‍♂️🔨🧱

One Bophut project continues to progress well, with the swimming pool and surrounding terraces now complete, including t...
25/04/2026

One Bophut project continues to progress well, with the swimming pool and surrounding terraces now complete, including the new concrete structure and sandwash floor beautifully finished.

Villa 3, the formation of new door and window openings has been successfully completed, and works are now moving into the next phase, including ceiling installation, skim coating, undercoat preparation, and tiling works.👷🏽‍♂️🧰🪚🛠️

Villa 9–10 at One Bophut are progressing well, with the main interior works now largely complete. The feature floating s...
16/03/2026

Villa 9–10 at One Bophut are progressing well, with the main interior works now largely complete. The feature floating staircase with glass balustrades has been installed, while flooring, wall finishes, and kitchen cabinetry are now in place. The villas are moving into the final stage of lighting, fittings, and finishing details ahead of handover. 👌🏼🔑🏠

One Bophut is progressing strongly, with Villas 9–10 now nearing handover. The pool terrace structure has been completed...
25/02/2026

One Bophut is progressing strongly, with Villas 9–10 now nearing handover.

The pool terrace structure has been completed, and works are moving forward onto the surrounding pathways as we enter the final stages.

Meanwhile, progress continues steadily on Villas 7–8, bringing the overall project closer to completion with each milestone achieved. ✅📋👷🏽‍♂️

Atara B5 is progressing well, with installation of the glass balustrades now underway, enhancing both the safety and the...
25/02/2026

Atara B5 is progressing well, with installation of the glass balustrades now underway, enhancing both the safety and the clean, modern aesthetic of the design.

At the same time, final stages of the swimming pool works are being completed.

The villa is steadily moving closer to completion as these key detailing elements come together.🌴😎🔑🏠

Atara A2– Final phase of rockwork installation, beng completed 🪨 😎 🏡
21/02/2026

Atara A2– Final phase of rockwork installation, beng completed 🪨 😎 🏡

We are very proud to announce that all 7 villas at Atara are now officially sold, with the final unit A1 recently secure...
18/02/2026

We are very proud to announce that all 7 villas at Atara are now officially sold, with the final unit A1 recently secured.

We would like to sincerely thank all of our valued clients for your trust and support in making this project a complete success. 👏🏻🙏🏻🥳🎉

ATARA A2-This villa is really taking shape, sanitary-ware is installed ready for testing. The swimming pool we plan to f...
30/01/2026

ATARA A2-This villa is really taking shape, sanitary-ware is installed ready for testing.

The swimming pool we plan to fill within the next few days, handover is scheduled for the end of February 🔑🏠☀️🌴😎

ที่อยู่

Ko Samui
84330

เว็บไซต์

แจ้งเตือน

รับทราบข่าวสารและโปรโมชั่นของ Pinnacle Projects & Developmentผ่านทางอีเมล์ของคุณ เราจะเก็บข้อมูลของคุณเป็นความลับ คุณสามารถกดยกเลิกการติดตามได้ตลอดเวลา

ติดต่อ ธุรกิจของเรา

ส่งข้อความของคุณถึง Pinnacle Projects & Development:

แชร์