10/09/2026
🏗️SW Logistics Park prioritizes construction quality at every stage, beginning with standardized soil preparation.
🏢This involves laying ( PP Woven Geotextile ) prior to construction to reinforce the soil, enhance load-bearing capacity, and minimize the risk of subsidence, thereby establishing a solid foundation that effectively and sustainably supports the building structures for the long term.
Contact
🌐 https://www.swlogisticsth.com/
📍 https://maps.app.goo.gl/x5cRzzS5UTkWaG11A
📧 [email protected]
📞 065-035-6999 (Office)
#รองรับนักลงทุนต่างชาติ #โรงงานให้เช่า #คลังสินค้าให้เช่า