10/26/2026
what can we say? we love what we do around here !!!
When your idea of a good day at work is 350 feet of brand new PVC sewer line in the ground โ yeah, we might love what we do a little too much.
This was a full sewer line replacement for a school in Denver โ out with 350 feet of old, broken 6-inch clay pipe, in with new, up-to-code PVC built to last for decades. Backfilling the trench on a job this size is honestly one of our favorite parts. It means the hard work is done, the new line is in, and we're one step closer to leaving everything better than we found it.