Selective demo means taking out exactly what needs to go — and protecting everything that stays.

For this renovation project, our team handled multiple areas of the home, carefully working within the contractor’s scope and leaving each space ready for the next phase.

Scope of Work:

* Selective basement demolition
* 2 full bathroom gut-outs
* Selective demo throughout the bedrooms
* Interior finishes and unwanted materials removed
* Debris hauled off-site
* Final cleanup for a build-ready finish

From one room to an entire property, All Around Removal provides clean, controlled selective demolition that helps contractors keep their remodeling projects moving.

Selective Demolition • Bathroom Demo • Basement Demo • Interior Demolition • Remodel Prep • Contractor Support

08/22/2026
08/13/2026

One basement. One day. Clean slate delivered.

This basement demo was completed start to finish in the same day, giving the contractor an open, build-ready space to move straight into the remodel.

Scope of Work:

* Full wall removal
* Ceiling demolition
* Framing removal
* Carpet & flooring removal
* Complete debris haul-off
* Final job site cleanup

Fast doesn’t mean rushed. With the right crew and workflow, we’re able to deliver clean, accurate demolition with same-day results while keeping the project on schedule.

All Around Removal — we demo, you build.

08/01/2026

Things I've seen as a demo contractor of 20 years that would shock you 👇

1️⃣ Cheap crew hit a load-bearing wall 💀 Nobody flagged it on the drawings. Nobody walked the site before swinging. $40,000 in structural repairs before the real job even started. The GC who saved $8,000 on the bid paid it back five times over before lunch.

2️⃣ The 3-day job that took 3 weeks 📅 Electricians waiting. Framers waiting. Tile crew rescheduled twice. Every trade behind them on the schedule has a contract too — and delay clauses in it. One slow demo crew doesn't just cost demo days. It costs the whole project.

3️⃣ Found asbestos on day 2 ☣️ No pre-demo testing. No hazmat plan. Work stopped, site cleared, abatement crew called in. Three weeks and $30,000 later they were back where they started. A $500 test before breaking ground would have changed everything.

4️⃣ Crew walked off mid-job 🚪 Took the deposit. Left the debris. Left the openings. Left the liability. Owner called us on a Tuesday standing in a half-demolished building with no crew, no timeline, and no leverage. We've seen this more than once.

5️⃣ No permits pulled 🚨 Inspection came anyway. Project shut down on the spot. Owner fined. Restart delayed months. The crew that saved them money on permits cost them the certificate of occupancy. Some savings aren't savings.

6️⃣ Wrong equipment for the structure ⚠️ Too heavy for the floor load. Nobody checked. Structural damage visible by end of day one. Building condemned pending engineering review. The cheapest machine on the quote sheet became the most expensive decision of the project.

7️⃣ They called us to clean it up 💸 We quoted it at the start. They went cheaper. Six weeks later we're back on site doing the job plus the damage plus the delay. Final cost was double our original number. Sometimes triple. We don't say we told you so. The invoice does.

07/31/2026

Lies the demolition industry has been telling General Contractors for years 👇

1️⃣ "We can start Monday."

Being available isn't the same as being prepared. Ask what they’ve actually done between now and Monday to scope your specific building.

2️⃣ "We've done hundreds of these."

Hundreds of what? A crew that's done 100 easy residential guts is still a first-timer on a complex commercial or pre-1980 hazard job. Match experience to your exact scope.

3️⃣ "Price includes everything."
..Until the surprise line items hit. Win low, bill real is a bidding strategy. Get a written scope naming exactly what IS included—and what changes the number.

4️⃣ "Demo is demo."

Sequence is the entire job. If they don't have a clear top-down, back-to-front plan for debris flow, expect delays and a hazard zone for the next trade.

5️⃣ "It’ll take three days."

A real timeline is math (crew size + haul schedule + contingency). A fake timeline is just a small number to win the bid. Ask to see the math.

6️⃣ "We’re fully insured."

The test question: "Can you name us as additional insured on the cert?" A legit crew does it in 24 hours. If they go quiet, you have your answer.

7️⃣ The "cheap bid" trap.

Saving $3,000 upfront means nothing when a 2-week delay cascades across your plumber, framer, and electrician. Cheap bids just invoice you in lost time.

💡 The Takeaway: Work with demo crews who show their math, sequence their work, and put it all in writing.

07/30/2026

7 things we’d NEVER do on a demo job — and interior demolition is our entire business. 🧨

Every rule here exists because someone, somewhere, skipped it. Here’s how we protect your schedule and site in the Tristate:

1️⃣ Guessing on utility disconnects 🔌 "Should be off" isn't off. We verify live wires and pipes ourselves before the first swing.

2️⃣ Blindly opening pre-1980 walls ☠️ Asbestos and lead turn a quick demo into a costly stop-work order. We test BEFORE we cut.

3️⃣ Assuming a wall isn't load-bearing 🏗️ Old renovations lie. Cutting first is how interior demo becomes a structural emergency.

4️⃣ Dry cutting concrete or plaster 😮‍💨 Silica dust ruins lungs and triggers OSHA flags. Water suppression and extraction are non-negotiable.

5️⃣ Letting heavy debris pile up 📉 Plaster and masonry add up to tons fast. We keep debris flowing OUT continuously so floors don't overload.

6️⃣ Prioritizing speed over sequence 🔄 Tearing into everything at once just creates a mess to climb over. Top-down, back-to-front sequencing is actual speed.

7️⃣ Leaving a rough site for the next trade 🧹 Demo isn't done until it's broom-clean and safe for the framers, plumbers, and electricians to start immediately.

The "cheap" crew is never cheap — it just gets invoiced later in delays and liabilities.

👇 Comment SAFE if you’ve seen a crew break one of these on your site!

Got an upcoming project in the Tristate? Hit the link in our bio for a crew that follows all seven. 📲

07/29/2026

Why cheap demo crews keep telling you "a few more days" 👇

Real site surprises happen, but most delays aren't surprises — they’re a business model. 🧨

1️⃣ "We hit surprises" 🔍 Bidding off photos means they’re discovering your building in real time — on your dime. A real crew walks the site first. 2️⃣ "Dumpster delays" 🗑️ Disposal IS the job. If workers are standing around waiting for a container swap, you're paying them to watch a parking spot. 3️⃣ Day-rate math 🧾 When a crew earns by the day, every extra day is revenue for them and a slipped phase for you. 4️⃣ "That's just demo" 📅 No — that's just THEM. Demo is step one. When it slides, your plumber, electrician, and framer slide, while your holding costs run up. 5️⃣ "We'll make it up" 🏃 The final stretch is cleanup and detail work — the slowest part of the job. If the middle was slow, the end is slower. 6️⃣ What real looks like ✅ Walked site, written scope, locked completion date, sequenced disposal.

A good demo sub gives you a price. A great one gives you a date and defends it.

Before you sign, ask: ✅ "Did you walk the site or bid off photos?" ✅ "What's the completion date, in writing?" ✅ "What's your disposal plan when the first container fills?"

Comment DAYS if you've heard "a few more days" this year — and if you've got a project coming up in the Tristate, the link's in bio 👇

07/28/2026

Lies general contractors have been told about demolition 👇

We're All Around Removal Services. Interior demolition for GCs across the Tristate, and our whole business exists because of these lies. Time to kill them. 🧨

1️⃣ Demo sets the schedule for everyone behind it. Every day demo runs over, your plumber, electrician and framer slide with it. It's not the cheap phase. It's the phase every other phase waits on.

2️⃣ Your framers are framers. Pull them into demo and you pay skilled rates for demo work, burn their energy before their real job starts, and both phases run late. Specialists exist because the math works.

3️⃣ The cheapest bid is cheap because something's missing: proper disposal, protection of what stays, site cleanup, or insurance. You'll find out which one after you've signed.

4️⃣ A professional demo crew walks the site, scopes it, and gives you a completion date you can build the rest of your calendar on.

5️⃣ Speed comes from crew size, sequencing, and disposal logistics — not from cutting corners. Slow isn't careful. Slow is disorganized wearing a hard hat.

6️⃣ Knowing what NOT to touch is the skill: what's load-bearing, what's live, what's behind that wall. The hammer is the last 10% of the job.

7️⃣ Demo is the loudest, dirtiest, most visible phase — and it's usually when your client shows up to look. A clean, controlled demo site sells YOUR professionalism before a single stud goes up.

We help GCs move from demo to rehab faster — which means more jobs on your calendar, not more days on your Gantt chart. 📈

Comment LIE if you've been burned by a demo crew, and hit the link if you have a Tristate project on deck 👇

Address

2742 Knights Road
Bensalem, PA
19020

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 5pm
Sunday 11am - 5pm

Telephone

+12672109374

Alerts

Be the first to know and let us send you an email when All Around Removal posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to All Around Removal:

Shortcuts

Share