05/29/2026
The backsplash installation is complete, and cleats have been added to the pantry shelves to ensure they are level. The paver patio has also been installed to provide a designated area for BBQ usage this prevents tenants from placing it near the home. Additionally, the cabinets are receiving a wood polish finish and the shower doors, light fixtures, and vanities have arrived.
Time to put it all back together! 🪄