07/04/2022
We do bathroom remodels. Full gut, allowance for materials that includes Sterling by Kohler tub, Moen or Delta bath fixtures, new tub drain, vanity with Moen or Delta fixtures and a standard toilet. Includes new paint new light fixtures, new mirror and new fan. New concrete boards and tile. Timeline for job from start of gut to finish is 6 days. Price $8,900. Same bathroom with a matching Kohler surround instead of tile surround is $7,900.