10/12/2026
Four homes, four completely different stages. π‘
Hereβs where things stand this week:
β’ A basement getting its gravel base before the slab
β’ Walls up and wrapped, waiting on roof trusses
β’ Trusses craned into place and the roof sheathed, with windows on the way
β’ Floors in, with doors and trim going in this week
This is what building looks like in real time, step by step. If youβd rather skip the wait, we keep a list of Trawick homes that are ready or close to it.
π Available homes: link in bio