07/23/2026
Progress continues across the project as crews move steadily through both interior and exterior work. Permanent power has been brought to the building, painters are making their way through the upper floors, interior trim installation is progressing, and plumbers have begun setting water heaters. HVAC crews are working to bring air conditioning online, creating the conditions needed for upcoming flooring installation, while electricians remain active throughout the building.
Outside, siding installation continues on the north elevation, site crews are backfilling curbs, and concrete work is scheduled to resume soon. Another exciting milestone is the arrival of the elevator's final shipment, with installation set to begin as the elevator contractor mobilizes on site. Each week brings the project another step closer to completion as multiple trades continue making excellent progress.
Owner/Developer: Overland Property Group
Primary Funding and Allocation Agency: Iowa Finance Authority
Pre-Development Loan: Legacy Bank
Construction Loan: Horizon Bank
Perm Loan: Cedar Rapids Bank & Trust
LITHC and other Investors: Midwest Housing Equity Group
General Contractor: Koester Construction Company
Architect: Jones Gillam Renz Architects
Civil Engineer: Snyder & Associates
Interior Designers: Collective Design Studio
Leasing and Property Management: Seldin Company