From lot prep โ final walkthrough, every new build follows a rhythm. ๐ ๐ Learn these 10 key stages so you can spot whatโs on track, whatโs delayed, and whatโs coming next. ๐ง
โ
Stage 4 - Insulation & Pre-Drywall:
With all of the internals in place, we are almost ready for drywall! Before the drywall can be installed, fire barriers, spray foam, and insulation is set into place. Sealant is installed in any cracks or joints, and the pre-drywall inspection is completed!