11/23/2022
Hey guys!! I’m going to finish out some of the last photos of the remodel for the time being. These are the remainder of the photos from the second story remodel before, during, and after.
This is the master bedroom and my (Heather’s) office. The spare bedroom is currently being used to store things as we get moved in, so I’m not adding those photos right now. That room had some of the least amount of work done to it - just a closet removal for the bathroom space, deywall, texture, paint and flooring. The master bedroom needed a lot. It is on the southside of the home where the termite damage was excessive. We removed the windows, and had to rebuild the southside exterior walls. We also had to tear into the ceiling quite a bit due to plaster damage. We removed one closet in that room, expanded out the bathroom 3 ft into the bedroom space, and then added a walk-in closet to the bedroom. The room was then spray foam insulated, sound proof magical padding (that’s what I call it) was added to the wall the bathroom adjoins to help with extra quiteness, and the room was completely drywalled and textured. We opted to leave the two windows we removed out, and shiplapped that wall and also installed a fireplace in the sitting area. The other room is the before and after of my office. That room mainly just required drywall and texture work.
We want to thank you all again for following along with us throughout this crazy, nearly two year, complete renovation project! What a journey it has been, and we are so happy to have had each of you along for the ride! We will be completing the lower level, and then next spring we will be tearing down the garage and adding a new large pole building and a new deck and landscaping is also in the plans! I will post as we go along for those still wanting to follow us occasionally. Again, thank you all! It’s been our pleasure to have you with us! Now, we celebrate Thanksgiving and our blessings and move the remainder of our belongings in!
Happy Thanksgiving to each of you!! ❤️