Falling Wooder Documenting the construction of our timber frame house in Sullivan County, PA

The plumbing manifold is finished and I installed the first two interior doors.
10/03/2026

The plumbing manifold is finished and I installed the first two interior doors.

09/24/2026

Turkey's fattening up for Thanksgiving!

The siding is finished except to punch list stuff.   Sorry for the dark pictures. No sun in Sullivan County today.
09/19/2026

The siding is finished except to punch list stuff. Sorry for the dark pictures. No sun in Sullivan County today.

I installed by first shower door.
09/19/2026

I installed by first shower door.

09/14/2026

Looks like this guy was checking out the new house last night.

Some of the siding is on and I installed the last of our music system.
09/06/2026

Some of the siding is on and I installed the last of our music system.

Two more railings are done.
08/22/2026

Two more railings are done.

The floors on the first floor are done!
08/12/2026

The floors on the first floor are done!

The dining room and master bedroom floor are down. Two rooms to go to finish the first floor.
08/08/2026

The dining room and master bedroom floor are down. Two rooms to go to finish the first floor.