09/02/2026
Carrollton Bank’s new downtown Edwardsville building is nearing completion 🏦
The roughly 14,000-square-foot facility sits at 235 S. Buchanan St., at Buchanan and Schwarz. The bank said in June that it should be substantially complete in August, with a move-in shortly after Labor Day.
Carrollton has operated in Edwardsville since 2019 from the Madison Mutual building on Park Street. The Buchanan Street project brings that operation into a purpose-built space of its own
📍 235 S. Buchanan St., at Buchanan and Schwarz
🏢 About 14,000 square feet
🏗️ Three stories per the contractor, 2½ per the bank
🔨 Built by Plocher Construction
💰 $3 million construction permit valuation, approved May 2025
🏦 Retail banking on the first floor
💼 Commercial banking on the second
🌇 Employee and event space on the third, indoor and outdoor
🌇 Views of downtown from the upper level
🚗 Three-lane drive-up already open next door at 245 S. Buchanan
📅 Move-in targeted for shortly after Labor Day
The site has seen a few chapters over the years. It was a Hardee’s, later DaVita Dialysis, and now a banking campus. The lot next door was Annie’s Frozen Custard until 2022 and became the drive-up facility that opened in July 2024.
An official opening date has not been announced. The Park Street branch remains the operating location until the move is complete.
📰 Read more at the link in comments.
Follow Ben Jenkins | Edwardsville + STL Area | Realtor for more updates on local development.