River Trace Phase Two - Foley, Al

River Trace Phase Two - Foley, Al This page was created for the property owners of the River Trace Phase Two subdivision. All owners are welcome and encouraged to be active on the page.

Get to know your neighbors. Share your thoughts and concerns.

06/18/2022

Greetings neighbors. The temperature as been getting up to 100 degrees with heat index of 120. Please stay safe and hydrated.

This is why the popcorn trees have to go. This tree was cut down over a month ago and cut into short pieces with hopes o...
04/20/2022

This is why the popcorn trees have to go. This tree was cut down over a month ago and cut into short pieces with hopes of seasoning it for the fire pit. The stumps have a lot of new growth which was to be expected until they are pulled out. But these cut up pieces with no roots are still growing. This is a very invasive tree.

If anyone in the River Trace Phase 2 subdivision is still on the fence about the CSpire fiber internet, they connected m...
04/16/2022

If anyone in the River Trace Phase 2 subdivision is still on the fence about the CSpire fiber internet, they connected mine today and it is fast! If you sign up through this link you will get a discount.

I love my C Spire Fiber internet – it’s faster, more reliable, and has way more bandwidth for all my devices. I know you’ll love it, too. Use my link to switch, and we both get $50 off for a limited time!

Middle detention pond work in progress. There is a large popcorn tree right in the path of the drainage that has to come...
04/10/2022

Middle detention pond work in progress. There is a large popcorn tree right in the path of the drainage that has to come out. It has caused the ground to build up around it almost level with the road.

I want to personally thank all of the property owners that have been working on the South pond, and those that have helped me with the middle and North ponds. With Hurricane Season only a couple of months away, hopefully the hard work will pay off should we see a storm.

We got the trees in the North detention pond cut down and removed today. Removing the stump sometime this week depending...
03/20/2022

We got the trees in the North detention pond cut down and removed today. Removing the stump sometime this week depending on the weather. Some smaller roots have penetrated the plastic culvert. Fingers crossed that it isn't too bad.

Current weather in River Trace Phase 2
02/22/2022

Current weather in River Trace Phase 2

Weather Underground provides local & long-range weather forecasts, weather reports, maps & tropical weather conditions for locations worldwide.

Address

Foley, AL

Website

Alerts

Be the first to know and let us send you an email when River Trace Phase Two - Foley, Al posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category