Phase III of the Bayview Estates paving project has begun. The City sent out a notification last
week to notify the residents of the upcoming project. If you did not receive this notification via
phone call, text message, or email, please contact Harford County Government to be added to
the alert system. You can call them at 410-588-5745, use the QR Code below or register online
at: https://www.smart911.com/smart911/ref/reg.action?pa=HarfordCountyAlerts.
The areas that will be affected with this project will be Hutchins Court, Brian Garth, Lighthouse
Court, Roosevelt Court, and Wilfong Court. The general contractor for the paving project will be
DXI. A subcontractor for DXI, Horne Concrete, will be replacing bad curbs and doing stormwater
inlet repairs in your neighborhood for the next 4-5 days. Some of the curb replacements may
affect access to your driveways for a couple of days. Curb replacement and inlet repairs have
already been completed on Lighthouse Court and Brian Garth. Once the curb replacements and
inlet repairs are completed, DXI will begin the paving process. The paving process will require a
coordinated effort between DXI and the residents to ensure access to your homes is maintained
and the actual paving process is able to occur at the same time. This will cause minor
disruptions with traffic in and out of your neighborhood.
We apologize for any inconveniences this may cause, but I’m confident that everyone will be
satisfied with the end result. Thank you for your cooperation in this matter and please feel free
to contact the Department of Public Works if you have any questions or concerns at 410-939-
1800 ext. 1135.