10/07/2026
What does it take to build the Navy’s newest dry dock? Officer in Charge of Construction Pearl Harbor Naval Shipyard (OICC PHNSY) shares the story of Dry Dock 5 (P-209), from early waterfront preparations to progress beneath the water and the work ahead to support fleet readiness.
Read the full story: https://dvidshub.net/r/kx5wxn
Before the walls of the Navy’s newest dry dock can rise at Pearl Harbor Naval Shipyard, crews must build beneath the water. Steel piles driven deep into the harbor floor form the perimeter, while underwater concrete connects floor units to form the base. Together, these elements are creating the f...