Ramshorn, Slope Side

Ramshorn, Slope Side Premier Slopeside Community

It’s May in the Mountains!!  Those new culverts are working great!!
05/06/2025

It’s May in the Mountains!! Those new culverts are working great!!

There are a lot of people crossing the crosswalk by the Kanc8 and they appear from behind the Kanc8 building suddenly!  ...
01/19/2025

There are a lot of people crossing the crosswalk by the Kanc8 and they appear from behind the Kanc8 building suddenly! We have added signage at the Kanc8 crosswalk! Please drive safely and slowly going thru this area, and Stop for Pedestrians!

Remiss in not posting that we started the painting rotation of the Ramshorn buildings this summer.  The new composite si...
12/21/2024

Remiss in not posting that we started the painting rotation of the Ramshorn buildings this summer. The new composite siding has held their paint for over ten years with no pealing! We had to paint mainly because they have faded. H Building was completed this fall. Next summer we will paint E Building.

Caulder Construction was on a roll and completed one of two culverts up top on the east end of H Building as well!  One ...
11/02/2024

Caulder Construction was on a roll and completed one of two culverts up top on the east end of H Building as well! One big culvert left that will be completed as part of the Retaining Wall project next spring.

Caulder Construction was finally able to come back and finish the other big culvert at the end of C Building!  Looks gre...
10/30/2024

Caulder Construction was finally able to come back and finish the other big culvert at the end of C Building! Looks great and is a huge relief to get this done!

When it comes to increasing our capacity to shed water, you have to start at the bottom and work uphill. We have now replaced all the culverts by C & D Buildings, that is five culverts and one large manhole basin. Essentially, we have replaced and increased the capacity of the culverts that 100% of the water that comes down the mountain travels thru!

Now they are headed up top to replace the upper culvert that comes off the trail by the east end of H Building. That will leave the other culvert that goes from H across the road to the parking area between F & G.

Think Snow!! ❄️

Caulder Construction started the replacement of the culverts by C Building today!  Should be completed by end of next we...
08/01/2024

Caulder Construction started the replacement of the culverts by C Building today! Should be completed by end of next week!

60mph gust last night took this large pine tree down across the road
03/12/2024

60mph gust last night took this large pine tree down across the road

12/18/2023
12/18/2023
12/18/2023

Thank god we replaced the 18” diameter culverts, between C & D Buildings, with 33” culverts just six weeks ago!!

Address

Ramshorn On Loon, Slopeside On Loon Mountain
Lincoln, NH
03251

Telephone

+16037288161

Website

Alerts

Be the first to know and let us send you an email when Ramshorn, Slope Side posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share