Model/Z Model/Z is transforming how affordable housing is built in the U.S.

Led by former SpaceX engineers and automotive execs, Model/Z uses AI-powered, volumetric modular manufacturing to build faster, more affordably, and with less waste.

Kathleen Kim, Sola Impact's  SVP of Construction, has built 24 multifamily housing projects across Southern California ....
07/13/2026

Kathleen Kim, Sola Impact's SVP of Construction, has built 24 multifamily housing projects across Southern California . She says building with Model/Z was different. Here's how she describes working with Model/Z on her last development.

A look inside a completed unit at 6200 Broadway, Model/Z's modular multifamily project in South Los Angeles. Each unit a...
07/03/2026

A look inside a completed unit at 6200 Broadway, Model/Z's modular multifamily project in South Los Angeles. Each unit arrives from our Watts factory move-in ready, with flooring, cabinetry, and fixtures already installed.

Before a Model/Z building comes together on-site, the process starts here!These modular units have already been manufact...
06/19/2026

Before a Model/Z building comes together on-site, the process starts here!

These modular units have already been manufactured, wrapped, numbered, quality-checked, and staged for delivery. Each one is built to exact specifications before it leaves the yard, which helps reduce the uncertainty that often slows down traditional construction.

Once delivered, the units are assembled on-site into a fully realized building. That is where modular construction changes the timeline.

Instead of relying on a long, linear construction process where every step depends on the last, Model/Z moves more of the work into a controlled production environment. That creates a faster and more predictable path to completion without compromising quality.

For developers, that means more certainty around schedules and delivery. For communities, it means housing can move from plan to reality faster. πŸš€

This past week we marked a milestone that everyone at Model/Z has been working toward since the day we opened our factor...
06/10/2026

This past week we marked a milestone that everyone at Model/Z has been working toward since the day we opened our factory doors: the completion of our first fully modular multifamily building! πŸ—οΈπŸŽ‰

Located at 6200 Broadway in South Los Angeles, the five-story affordable housing development was completed in partnership with SoLa Impact . Every apartment was manufactured off-site at our Watts facility where we build the finished apartments in a factory, transport them to the construction site, and stack them into place.

Our project by the numbers:
🏒 5 stories
πŸ“¦ 70 total modules
πŸ›οΈ 66 one-bedroom modules at 419 sq ft
⏱️ 11.7 months from groundbreaking to Certificate of Occupancy
πŸ”§ 10 working days for structural set of all 70 modules
πŸ’° Per-door all-in cost in the low $300,000s
πŸ“Š Unit mix: 80% of units at 80% AMI; 20% of units at 110% AMI
πŸ“… 14+ months saved relative to a conventional timeline

6200 Broadway is proof of the speed and scale that is possible with modular and a clear look at the future of construction we've been working toward from the beginning.

Read the full press release: https://www.model-z.com/news/modelz-and-sola-impact-complete-modular-multifamily-building-in-los-angeles-in-under-12-months

South LA could be getting something special. πŸ™ŒThe LA City Council has voted to enter into an exclusive negotiating agree...
06/02/2026

South LA could be getting something special. πŸ™Œ

The LA City Council has voted to enter into an exclusive negotiating agreement with SoLa Impact for The Honeycomb: a proposed campus at 10901 S. Clovis St. that would include a Model/Z modular housing manufacturing facility, a vocational school, a tech center, offices, rooftop solar, and community green space.

There are still negotiations and approvals ahead, but we are excited about the opportunity to replicate this model around our facility!

Full story: https://la.urbanize.city/post/modular-housing-manufacturing-proposed-city-owned-site-10901-s-clovis-st-south-la

The Los Angeles City Council has voted to enter into an exclusive negotiating agreement with developer SoLa Impact for a project which could bring a new modular housing manufacturing facility to South Los Angeles.

05/27/2026

Most multifamily projects lose months in the pre-construction phase: sourcing parcels, testing zoning, sketching, and running early feasibility. Z/Suite compresses that work into minutes.

This walkthrough shows how our proprietary AI-enabled planning software handles parcel-level zoning analysis, automated massing, 3D modeling, and feasibility in a single workflow.

FREE early access is open to a limited group of partners. If you're a multi-family developer working on 50+ unit projects, send us a message to get on the list!

We're excited to share a look at what's coming later this year!4301 Vermont will bring a planned 188 units to South Los ...
05/15/2026

We're excited to share a look at what's coming later this year!

4301 Vermont will bring a planned 188 units to South Los Angeles, slated for installation in late 2026. The building includes apartments, a community space, ground-floor retail, and the same factory-built quality we will be delivering at our 6200 Broadway project in May.

We're just getting started. More projects in the pipeline for 2026 and beyond. πŸ‘€

05/06/2026

β€œThere’s no place like home.”

Our biggest highlight from April.

Our Fire Relief ADU initiative began with our mission to support those impacted by the LA fires so they can return, recover, and remain in their communities. And we’ve been able to bring that mission to life.

Looking ahead to a strong May! Stay tuned for updates on what we've been working on.πŸ‘·

Happy May 1st from the Model/Z team.We're heading into a big month at 6200 Broadway in South LA, and the building is sta...
05/01/2026

Happy May 1st from the Model/Z team.

We're heading into a big month at 6200 Broadway in South LA, and the building is starting to show its final form. Exterior finishing details are going up now, bringing the 66-unit, 5-story project closer to completion.

More updates and announcements coming soon on this project. We're excited to share more soon!

After the Eaton Fire, families in Altadena are finally back in a space that feels like home, and we had the opportunity ...
04/21/2026

After the Eaton Fire, families in Altadena are finally back in a space that feels like home, and we had the opportunity to be part of making that happen alongside an incredible group of partners.

You can talk about speed, efficiency, and innovation all day, but this is what it comes down to. Real people, real homes, and a community coming back together sooner than anyone expected.

We’re proud to have been part of it and grateful to everyone who showed up to make it possible.

Address

1000 E 60th Street
Los Angeles, CA
90001

Alerts

Be the first to know and let us send you an email when Model/Z posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Model/Z:

Shortcuts

Share