08/05/2026
Not every project starts with a ribbon cutting. This one starts with an excavator.
Demolition is underway at 12735 Ixora, clearing the site for a new waterfront residence.
Right now, it’s loud, dusty, and very far from the finished photos—but this is the reset every new build needs. The existing structure comes down, the lot opens up, and the possibilities become much easier to see.
Next up: a clear site, a solid plan, and plenty more to come from Ixora.
Follow the build with AG General Contractor.