Historic Moclips Tavern Building

Call Directions Website Contact the business

Historic Moclips Tavern Building $575,000 One can easily fish from this property for salmon, trout, etc. The square footage of the enclosed tavern building is 2,820 square feet.

The 𝗛𝗶𝘀𝘁𝗼𝗿𝗶𝗰 𝗠𝗼𝗰𝗹𝗶𝗽𝘀 𝗧𝗮𝘃𝗲𝗿𝗻 𝗕𝘂𝗶𝗹𝗱𝗶𝗻𝗴 is the only existing commercial building in the beach resort community of Moclips which is not in use and is for sale. This property is located in an Opportunity Zone, is gated and fenced, and sits on approximately ¾ of an acre that not only has approximately 189’ of state highway frontage but has 150+ feet of Moclips river frontage. The original brick building consists of 2,160 square feet and the wood part of the structure is an additional 660 square feet on the west end of the brick building. On the east end of the building there is a covered porch area which adds another 240 square feet to the footprint of the Tavern building for a total footprint of 3,060 square feet. If applicable, it looks like a second-story could be developed with dormers. The superstructure above the brick building is almost completely old growth cedar and is very impressive. County sewer and water are on-site. Due to the building being commercial, an explosion-proof sewer system and explosion-proof sewer electrical system were installed in 2013/14. The roof is newer as well as the wiring (120/220) in the tavern building is all new and in-conduit with led lights that run through the main tavern area. There is a large 12’ x 5’ custom stainless hood vent with a chimney across one side of the kitchen and a take-out window adjacent to the covered walkway. Other items included in this sale are gas stoves and grill, old tavern lights, 2 pool tables, cooler/freezer, bar stools, numerous vinyl booths including a corner booth. The bar itself is still in as well as the cooler structure. The original fireplace and chimney are in use and the parking lot is paved. The inside of the tavern building is basically gutted and immediately ready to finish it up with your plans. Besides the tavern building, this lot also has approved engineered plans for a 3-story duplex residence and the footings are already in. The footprint of this building is 24’ x 65’ with decks on the 2 upper levels which are 12’ x 30’. The total footprint of this structure is 1,920 square feet in addition to the tavern building. The bottom level is parking, etc with 9’ ceilings. The engineered duplex residence is approximately 3,000 square feet of living space, and this project is also immediately ready to go and included in this sale. There was an ocean view from ground level of the previous residence on the same spot which has since been demolished. The views from the upper two levels of this engineered structure will be spectacular and truly unique with everlasting views of the Pacific Ocean to the west and the majestic Moclips River to the north. The income possibilities are plentiful with this versatile property. The tavern building and property is owned free and clear and ready for immediate sale and transfer. The owners can be cleared out and vacated by the time it takes to conduct a normal purchase and sale transaction through the Grays Harbor Title. Do not hesitate to make a reasonable offer on the property and opportunity of a lifetime! Zoned R-3

𝗕𝘂𝘆𝗲𝗿 𝗳𝗶𝗻𝗮𝗻𝗰𝗶𝗻𝗴 𝗽𝗼𝘀𝘀𝗶𝗯𝗹𝗲 𝘄𝗶𝘁𝗵 50% 𝗱𝗼𝘄𝗻

𝘈𝘭𝘭 𝘱𝘳𝘰𝘱𝘦𝘳𝘵𝘪𝘦𝘴 𝘢𝘳𝘦 𝘭𝘰𝘤𝘢𝘵𝘦𝘥 𝘪𝘯 𝘢 𝘘𝘶𝘢𝘭𝘪𝘧𝘪𝘦𝘥 𝘖𝘱𝘱𝘰𝘳𝘵𝘶𝘯𝘪𝘵𝘺 𝘡𝘰𝘯𝘦.

𝑨𝒕𝒕𝒆𝒏𝒕𝒊𝒐𝒏 𝑹𝒆𝒂𝒍𝒕𝒐𝒓𝒔: 𝑾𝒆 𝒂𝒓𝒆 𝒐𝒑𝒆𝒏 𝒕𝒐 𝒂 𝑶𝒏𝒆 𝑷𝒂𝒓𝒕𝒚 𝑶𝒏𝒆 𝑻𝒊𝒎𝒆 𝑳𝒊𝒔𝒕𝒊𝒏𝒈

Sellers will provide the Purchase and Sale Agreement based on preliminary discussions and/or written negotiations/offers between parties. Grays Harbor Title will hold all funds and handle the closing. There are convenient conference rooms in Aberdeen if applicable. All discussions, negotiations, offers, and pricing will remain confidential between parties.

𝗙𝗢𝗟𝗟𝗢𝗪 𝗨𝗦 𝗛𝗘𝗥𝗘 𝗢𝗡 𝗙𝗔𝗖𝗘𝗕𝗢𝗢𝗞 𝗙𝗢𝗥 𝗔𝗟𝗟 𝗢𝗙 𝗧𝗛𝗘 𝗟𝗔𝗧𝗘𝗦𝗧 𝗜𝗡𝗙𝗢𝗥𝗠𝗔𝗧𝗜𝗢𝗡 & 𝗨𝗣𝗗𝗔𝗧𝗘𝗦

10/16/2026

View full image Airport Alert Open year round. Please check NOTAMs for operational activities or closures. When navigating to Copalis Beach State Airport, Pilots are highly encouraged to check the daily ocean tides, which can affect runway conditions and prohibit landing. Caution: For debris, dead w...

10/11/2026
Ocean View Water Front Property For Sale in Moclips. Commercial & Residential Opportunities.Commercial Grade Sewer & Wat...
10/10/2026

Ocean View Water Front Property For Sale in Moclips.
Commercial & Residential Opportunities.
Commercial Grade Sewer & Water On-site.
Stop By and Check Out this Amazing Property For Sale!
IF THE GATES ARE OPEN, WE ARE OPEN FOR VIEWING!
Appointment Always Available.

10/07/2026

Over a century ago, before the logging boom forever changed the economy of Grays Harbor, thousands flocked to the bluffs of the North Beach. Sold on the region through advertising promising a healthy getaway from the stresses and frantic pace of city life, tourism to Pacific Beach and Moclips flourished. Link in comments.

10/02/2026
Grays Harbor County Fire Marshal’s Office and Fire Districts are lessening restrictions on outdoor burning in Grays Harb...
09/18/2026

Grays Harbor County Fire Marshal’s Office and Fire Districts are lessening restrictions on outdoor burning in Grays Harbor County to allow recreational burning.

Welcome to Grays Harbor County

Opportunities like this are hard to find!
09/15/2026

Opportunities like this are hard to find!

09/14/2026

Emergency Management hears about Hoh River Bridge repairs

The North Coast Operational Area meeting was held Wednesday, Sept. 9, in Clallam Bay, with WSDOT representatives Littleton Dudley and Melissa Mies providing an update on the Hoh River Bridge closure and upcoming emergency repairs.

The 95-year-old bridge, located at milepost 176.5 on US 101, carries about 1,400 vehicles a day and is the only connection between the West End and Grays Harbor County for residents, tourists, freight and emergency services.

During a routine inspection earlier this summer, WSDOT bridge engineers discovered cracks in several floor beams, along with extensive rust and corrosion. The beams were designed to slide as the bridge expands and contracts, but corrosion has prevented that movement, changing how the bridge’s weight is carried and contributing to the cracking.

On July 14, WSDOT reduced the bridge to one lane of alternating traffic with temporary signals and lowered the speed limit to 25 mph. However, WSDOT officials said they did not believe the bridge could safely remain open through the winter, leading to the current emergency closure and repair project.

The near-term emergency repair, estimated at $2 million, will replace four floor beams, install new sliding bearing plates and joints, clean and paint critical portions of the structure, and replace some rivets. The work is intended to keep the bridge operational under one-way traffic restrictions until a larger long-term repair can be completed.

The long-term project is estimated at nearly $10 million and will include replacing additional floor beams and painting the entire bridge.

Multiple full closures planned

The emergency repairs will require several overnight closures followed by up to three full, around-the-clock closures lasting as long as six days each. The first overnight closure was scheduled for Monday, Sept. 14, but changed Monday morning to Tuesday, Sept. 15, with the first extended closure scheduled to begin Sept. 24 at 5 a.m.

WSDOT said the schedule could change depending on weather, construction discoveries and the results of bridge inspections. Workers will be operating from platforms on the bridge, making high winds and heavy rain potential causes for delays.

There is a possibility the work could be completed ahead of schedule. If everything goes well, WSDOT said the third extended closure may not be necessary. However, officials stressed that the current schedule is intentionally conservative because additional problems may be discovered once the bridge is opened up for repairs.

Each extended closure will be followed by a daytime bridge inspection before traffic is allowed to resume.

There is no alternate route across the Hoh River. Drivers traveling between Forks and Hoquiam will have to take US 101 around Hood Canal, a trip that could take approximately four hours.

Emergency responders will have pedestrian access across the bridge during closures, but the pedestrian route will not be open to the general public.

WSDOT is coordinating with Forks Community Hospital, Lake Quinault-area emergency services, Clallam County PUD, law enforcement agencies, the Hoh Tribe, Olympic Corrections Center, local school districts and other agencies to address essential travel and emergency needs during the closure.

WSDOT’s Travel Center map and traffic alerts will provide the most current information on closures and reopenings.

WSDOT representatives emphasized that the bridge work is necessary to keep the aging structure safe and operating for as long as possible, while acknowledging the significant disruption the closures will cause for West End residents, businesses and visitors.

Another concern mentioned was Forest Service Road 30, an evacuation route between Highway 112 and US 101. The road was scheduled to close Sept. 14 and remain closed until at least Oct. 16 while major landslide repairs are completed.

Other discussion included the Clallam Bay Walk Map for emergency planning, the release of the latest Alaska tsunami modeling, potential flooding impacts on coastal communities and rivers in Clallam County, and available grant opportunities.

Address

48111 WA 109
Moclips, WA
98562

Alerts

Be the first to know and let us send you an email when Historic Moclips Tavern Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Historic Moclips Tavern Building:

Shortcuts

Share

Category