Electric rough started in Monett today. Soon we will hang cold walls and get this house spray foamed!

10/14/2026

We have a full house roughing in on our second build in Mount Vernon.

We appreciate JMR Plumbing & Electric and Dion's Heating and Air Services for getting us taken care of!

Racing toward the finish line at the North Main Street project! Brick steps will be wrapping up Friday. Pine post and ga...
10/14/2026

Racing toward the finish line at the North Main Street project!
Brick steps will be wrapping up Friday.
Pine post and garage opening are stained.
Plumbing and electrical trim outs are complete.
Tile backsplash is going in.
Lockout and accessories followed by final punch and this house will be ready for new owners!

Framing is wrapping up, windows and the sliding door are in, the roof is on, and rough-ins are underway.Soon, 848 N. Mai...
10/04/2026

Framing is wrapping up, windows and the sliding door are in, the roof is on, and rough-ins are underway.

Soon, 848 N. Main will come to life with cozy interior finishes and an exterior palette inspired by the timeless look of the Hamptons.

09/24/2026

Update in Mount Vernon!
Let me know what y’all think!

1645 Ridgemont in Monett almost done framing. Time to get it dried in so we can get our MEP rough ins!
09/18/2026

1645 Ridgemont in Monett almost done framing.

Time to get it dried in so we can get our MEP rough ins!

Two projects are rolling in the framing phase. In Monett, 1645 Ridgemont is getting the roof framed and pretty soon 1675...
09/15/2026

Two projects are rolling in the framing phase.

In Monett, 1645 Ridgemont is getting the roof framed and pretty soon 1675 Ridgemont will start taking shape!

In Mount Vernon, 730 N. Main kicked framing off today. The subfloor assembly is down and walls are starting to take shape!

Keep following along as we build across the Ozarks🏡

09/05/2026

Mud went down on the second slab in Monett at six this morning.

Time to beat the heat 🔥

Why choose when you can have BOTH?716 N. Main said no to picking a lane — sage green 🌿 in the bathrooms, Iron Ore black ...
09/04/2026

Why choose when you can have BOTH?

716 N. Main said no to picking a lane — sage green 🌿 in the bathrooms, Iron Ore black 🖤 in the kitchen and laundry. Two moods, one home, zero regrets.

Swipe through and tell me: which room is stealing the show? 👀

👇 Sage Green or Iron Ore — Let us know!

09/04/2026

Interior finishes are rolling at 716 N. Main in Mount Vernon.
The floor is in and cabinets are set. We can’t get over how it is all coming together!

Millwork is next on the docket!

Address

Mount Vernon, MO
65712

Telephone

+14177550469

Website

Alerts

Be the first to know and let us send you an email when DMG Build Co. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DMG Build Co.:

Shortcuts

Share