09/21/2026
DATA CENTERS or BESS (Battery Energy Storage Systems): DEVELOPERS, INVESTORS AND LANDOWNERS
In light of recent political and regulatory developments, careful due diligence is more important than ever before committing substantial capital to a proposed BESS or data-center project.
A large industrial land site should no longer be valued primarily on the possibility of a speculative data-center sale or development. Before assigning a data-center premium to the property, confirm the following:
• Sufficient electrical capacity is available—not merely located nearby
• The utility can provide a realistic delivery schedule and cost estimate
• The municipality supports data-center development at the site
• Zoning and entitlement requirements can be satisfied
• Transmission, substation and interconnection upgrades are feasible
• Water, fiber and other necessary infrastructure are available
• Noise, environmental and community concerns can be addressed
• Tax incentives and government approvals are reasonably achievable
Proximity to a substation does not guarantee that adequate power is available. Until power, municipal support and entitlement feasibility have been established, the property should generally be valued based on its existing zoning and other realistic industrial uses—not on an unverified data-center exit.
Contact me for your Commercial Real Estate needs.
Peter Cotsirilos
Caton Commercial
630-253-4929