Portico at Perdido

Portico at Perdido A vision by developer Ron Durham. Introducing Portico at Perdido, a stunning collection of 27 beachfront residences.

12/19/2022

The temperatures might be frightful now, but beach days are ahead! ☀️ The Portico at Perdido project is now about 86% complete. The remaining site work will be completed over the next few weeks, followed by the finishing touches.

No matter the time of year, residents will enjoy a gulf-front heated indoor pool and stunning sunset views.

12/19/2022

A recent site visit to our clients’ brand new gulf-front condo on Perdido Key! This development is looking incredible, and it was a pleasure to meet with their team for a tour as we near completion & closing👏

Portico at Perdido

09/07/2022
Happy May! ☀️ We are so excited to share a few photographs taken in April that show the Portico at Perdido team’s constr...
05/03/2022

Happy May! ☀️ We are so excited to share a few photographs taken in April that show the Portico at Perdido team’s construction progress.

Ground Level through Level 8 concrete slabs have all been poured! The east half of Level 9 was poured in April as well.

We are projecting to complete the roof slab pours around the end of May which will top out the structure.

We only have one Portico at Perdido residence remaining - Residence 203! ✨
4 bedroom | 4.5 bathroom | 2,891 sf.

Portico at Perdido is excited to announce that there is only ONE more residence remaining! ☀️Interested in learning more...
01/17/2022

Portico at Perdido is excited to announce that there is only ONE more residence remaining! ☀️

Interested in learning more? Contact the Portico at Perdido sales team today! [email protected]

We are happy to share new photographs from the Portico site taken in December 2021. It's a very exciting time going into...
01/01/2022

We are happy to share new photographs from the Portico site taken in December 2021. It's a very exciting time going into 2022 with only TWO Portico residences remaining! ✨ Wishing everyone a blessed, prosperous, and healthy New Year!

- The Portico at Perdido Team

It is with a grateful heart that we wish you and your family a very Merry Christmas from Perdido Key! 🎄
12/25/2021

It is with a grateful heart that we wish you and your family a very Merry Christmas from Perdido Key! 🎄

11/25/2021

Portico at Perdido wishes you all a very blessed, safe, and happy Thanksgiving! We are so thankful for all of you! 🦃🌽

We are excited to share the most recent construction progress Portico at Perdido has made. We only have four residences ...
11/13/2021

We are excited to share the most recent construction progress Portico at Perdido has made. We only have four residences remaining! ✨ Also, take a peak at the latest photographs taken during the month of October at the Portico site!

Thank you to BLHI Senior Superintendent, Hal Clements, for sharing the detailed construction update below with us:

The past 3 weeks:

- We poured the 615-yard core pile cap foundation on 10/23. That’s about 70 concrete mixer trucks averaging almost 90 yards per hour.

- After stripping the mass cap, we formed and poured the stair and elevator shear wall cans and columns. We poured two cores, and the third core scheduled for 11/12.

- We have also been working on finishing the small pile caps. To date, three pile caps are remaining. These will be complete before Thanksgiving.

- Pouring columns has been on-going for the past three weeks, working from east to west following the pile caps.

- Last Monday, 11/1, we began grading the site and putting down the stone to shore the first level deck.

- Waterproofing on the two elevator pits began on 11/8.

- The first delivery of shoring / forming for level 1 started. Beam and slab decking will begin on 11/17.

- Under-slab storm, inlets, and piping is ongoing and scheduled for completion on 11/19.

- Plumbing and electrical underground started on 10/25.

Blessings,
The Portico at Perdido Team

08/14/2021

When vacation destinations and work combine.

08/06/2021

Steve, our Project Engineer on the Portico at Perdido jobsite, has been busy laying out the edges of the crane pile cap.

The deep foundation piles for the crane are now complete and we will start digging the shallow foundation cap next Monday.

Address

14701 Perdido Key Drive, Perdido Key
Perdido, FL
32507

Alerts

Be the first to know and let us send you an email when Portico at Perdido posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Portico at Perdido:

Share

Category