RST Environmental Protection Office

RST Environmental Protection Office My name is Alexander Swalley III, AKA (Boe). Ivan Crow Eagle Director (605)-747-2933 fax 2935

Welcome to The RST Environmental Protection Office, I am the Brownfields Coordinator for the Tribe, all so has the GAP, UST, Water 106 and Pesticides programs.

07/11/2024
This was a Underground Storage Tank (UST), Project that was done this past November in 2023, we pulled 3 underground sto...
02/27/2024

This was a Underground Storage Tank (UST), Project that was done this past November in 2023, we pulled 3 underground storage tanks at Spi Spiza Corner in Corn Creek Community. This was a good learning experence for me and our UST Coordinator. EPA provided the contractor,

This is the Blue Building, which is also located in the Two Strike Community, it sits just West of the the Red Log Build...
02/27/2024

This is the Blue Building, which is also located in the Two Strike Community, it sits just West of the the Red Log Building, about 50 yards from it. This building was loaded with Lead Based it was Abated the Demoed. This project was paid for by the Brownfields Program, (TRP). The Contractors were Gotek Engineering 7 testing Services out of Sioux Falls and their Subcontractors were Great Plains Asbestos Control Inc. out of Neb. and LaCreek Development Corporation out of Martian South Dakota. Project was completed in 2023.

This is the Red Log Building located in the Two Strike Community, this building had Asbestos tiling, Lead Based Paint an...
02/27/2024

This is the Red Log Building located in the Two Strike Community, this building had Asbestos tiling, Lead Based Paint and Mercury Switches. The Brownfields Program or Tribal Response Program,(TRP) paid for this Abatement on this building, and that was it. This project was completed in 2023.

This was the old admin building for Sinte Gleska University, also served as a Hotel.  This building contained Asbestos t...
02/26/2024

This was the old admin building for Sinte Gleska University, also served as a Hotel. This building contained Asbestos tiling, Lead Based Paint, Mercury Switches. The EPA also provided their own contractors for the project. The building was Abated and demoed in November 2017, and was converted into a parking lot for the new Annex Building in the fore ground.

This was the old Forestry Building, it also served as an Ambulance Service at one time.  This building had Asbestos all ...
02/26/2024

This was the old Forestry Building, it also served as an Ambulance Service at one time. This building had Asbestos all over which served as a type of Fire Proofing. The building was abated and demoed in 2015. Environmental Protection Agency (EPA), provided the contractors for this project.

This was the Old BIA Jail, this facility also had Asbestos, Lead Based Paint, Mercury Switches and it too was Abated.  T...
02/26/2024

This was the Old BIA Jail, this facility also had Asbestos, Lead Based Paint, Mercury Switches and it too was Abated. This building was Demoed the same time as the Old CHR building, in 2015.

This is the old CHR building that was Abated and Demoed in 2015, the building had Asbestos, Lead Based Paint, Mercury Sw...
02/26/2024

This is the old CHR building that was Abated and Demoed in 2015, the building had Asbestos, Lead Based Paint, Mercury Switches. The contractor for this project was American Engineering out of Rapid City SD.

Address

PO Box 428
Rosebud, SD
57570

Website

Alerts

Be the first to know and let us send you an email when RST Environmental Protection Office posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category