09/04/2021
We completed a structural repair job last week. This two story townhouse had a water damaged rear wall that was discovered by a home inspection for a sale. Upon opening the wall, we found out that the damage affected the header over the glass sliding door, the top plates on the first story wall and the floor joists for the second story. Once we got the engineered drawings and permit pulled, it took about 5 days to complete the repair and make it look like we were never there. The interior paint and roof for the screen room were not in our scope. Keep us in mind for this type of work.