Florida condo

Florida condo 2 bed, 2 bath condo for rent in quiet gated community in Sebastian, FL.

Pool, tennis, 9-hole golf course, clubhouse, marina, fitness center, tennis, bocce ball, shuffleboard, card games, events and BBQ’s.

05/28/2026

Japan just powered its entire Shinkansen bullet train network from solar energy alone — 3,200 kilometers of track, 450 daily trains, 500,000 daily passengers, zero carbon emissions from the world's most famous railway.

JR Central completed installation of solar canopy structures over 2,800 kilometers of Shinkansen track across Japan's main island, mounting bifacial solar panels on elevated structures above railway lines that previously served no energy purpose. Each kilometer of solar canopy generates enough electricity to power three Shinkansen trains simultaneously at 320 kilometers per hour. The panels were designed to withstand Japan's frequent typhoons and seismic activity through a flexible mounting system that absorbs both wind loads and ground movement without damage.

Japan's railway network consumes 27 terawatt-hours of electricity annually — 3 percent of the nation's total consumption. The solar track canopy system generates 31 terawatt-hours, covering the entire railway system's demand with 4 terawatt-hours of surplus sold back to regional grids along the line. Japanese engineers solved the grid integration challenge by using trains themselves as mobile energy storage, regenerative braking on downhill sections feeding captured energy forward to ascending sections instantaneously.

The project demonstrates that existing linear transport infrastructure represents one of the most underutilized solar surfaces in the world, available in every country regardless of land availability.
Source: JR Central Japan, Japanese Ministry of Land Infrastructure Transport, 2025

05/15/2026

The Oregon Public Utility Commission has implemented a new rule to keep Portland General Electric’s (PGE) residential and commercial rates from rising as more data centers are built across the state. The rule creates a separate rate class for large data centers, requiring them to pay their share of electricity usage and for the grid upgrades they need. This means data centers cover most of the costs, not Oregonians.

Before the rule, PGE’s data center customers paid about 8 cents for each kilowatt‑hour of electricity, while residential customers paid about 20 cents, according to the Oregon Citizens’ Utility Board, a state utility watchdog group.

‘Oregonians should not bear the costs of explosive data center growth, and data centers should be focused on limiting their overall impact,’ Oregon Public Utility Commission Chair Letha Tawney said in a statement.

04/09/2026

The picture from the polling data was not positive for the president even among voter groups favorable to him.

Address

Sebastian, FL
32958

Website

Alerts

Be the first to know and let us send you an email when Florida condo posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Florida condo:

Share