Hayes Maintenance and Home Imp

Hayes Maintenance and Home Imp Will do all kind of home maintenance, remodeling, flooring, bathrooms and kitchens

Just got through adding a second bathroom in a cabin to make it a 3/2.  The cabin had a large utility room that backed u...
02/10/2026

Just got through adding a second bathroom in a cabin to make it a 3/2. The cabin had a large utility room that backed up to the closet. Removed the wall and moved it back 28 inches which gave me plenty of room for the washer dryer and water heater and room to add shower and toilet. Here are some before and after.

Had a bathroom that was built with poor layout to where you have a hard time moving around the home owners wanted to cha...
11/19/2025

Had a bathroom that was built with poor layout to where you have a hard time moving around the home owners wanted to change things around so it could be more accessible with a wheelchair if needed. What do you think of before and after. Oh by the way did increase the door opening by 2 inches.

Just finished taking a full hall bath and a master 1/2 bath and converted it to 2 full baths. Did have to move master cl...
11/06/2025

Just finished taking a full hall bath and a master 1/2 bath and converted it to 2 full baths. Did have to move master closet. Here are some before and after.

Been remodeling a 100 year old bathroom this bathroom has been touched sent it was put in. Here are before, during and a...
06/27/2025

Been remodeling a 100 year old bathroom this bathroom has been touched sent it was put in. Here are before, during and after pictures. Just to let you know we did move the entry door going into the master and removed one of the bathroom door, yes there was 2 doors going into the bathroom. What you think of the transformation?

Here is pictures of start to finish of a bathroom remodel the beginning is corner jetted tub with full wall between show...
03/19/2025

Here is pictures of start to finish of a bathroom remodel the beginning is corner jetted tub with full wall between shower and toilet area and vanity are golden color. The demo was done the first day.

Been working on a bathroom redesign and total update. Here are some before and after.
01/28/2025

Been working on a bathroom redesign and total update. Here are some before and after.

12/22/2024

Would like to wish everyone a Merry Christmas

Kitchen remodel just finished before and after.
08/16/2024

Kitchen remodel just finished before and after.

Been working on the church sanctuary for the last few weeks. Here are some pictures
07/22/2024

Been working on the church sanctuary for the last few weeks. Here are some pictures

Started and finished a bathroom remodel this week going from 1950’s to current century.  I do like the outcome.
04/19/2024

Started and finished a bathroom remodel this week going from 1950’s to current century. I do like the outcome.

Love the transformation of this bathroom. What do you think?
04/05/2024

Love the transformation of this bathroom. What do you think?

Here is a bathroom just remodel. Theee is 9 foot ceilings in this house there was and old fiberglass tub shower (in rose...
03/27/2024

Here is a bathroom just remodel. Theee is 9 foot ceilings in this house there was and old fiberglass tub shower (in rose color) that was removed. There is also a head wall at the front of the old shower that came down from ceiling to about 6 foot which made that area feel claustrophobic. Added new vanity new tile floor and complete new tile shower. 

Address

Seymour, TN
37865

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Website

Alerts

Be the first to know and let us send you an email when Hayes Maintenance and Home Imp posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Hayes Maintenance and Home Imp:

Share