05/07/2026
This will be interesting . . .
The temporary traffic signal at the Surf City Bridge is now active. 🚦
This pilot project is a joint effort between NCDOT and the Town of Surf City in an attempt to help reduce congestion at the roundabout by allowing more vehicles already on the island to move through more efficiently.
Drivers should be aware of the new signal and continue to follow all posted signage and roundabout traffic patterns.
As a reminder, this is a temporary setup while traffic patterns are evaluated.
All pedestrian walkways within the island roundabout are temporarily closed. Please follow posted detour routes.
Thank you for your patience as we work toward a long-term solution.