Today was one productive day, that’s for sure.
Doug and Max were finishing up a house renovation project, where we installed a new deck and stair case off the back of the house, installed 90 yards of topsoil, seed and mulch. installed two rock retaining walls and pathway! installed new flooring, installed two new showers and tubs, painted the kitchen, dining room and bath rooms! Pictures soon to come!
Alyssa and Dillan did 20 yards of bark mulch in Brookline. They power edged and weeded all beds and brought them back to perfection!! Amazing work you guys!
Corey and Tanner continued on revamping some blue stone patios, and fixing up some rock walls, we also cleaned up a fallen pine tree and installing new culverts and ditches, which we will resurface the driveway in the morning.
The crew did an incredible day to say the least they put some work in!