09/10/2026
Another Happy Customer!!! This was a long project, not only did we break down this double wide but also transported and set back up. We also hooked up the AC unit, put in a newer power pole, ran the power, hooked in the water and hook up to sewer. Then we were hired to paint the entire inside of the house after 2 other people had tried to paint, also lay the flooring, change all the light switches and outlets, all of the light fixtures and fans, put in new shut off on all water lines, rip out old base boards a s install all new base boards, and install new vanity in the spare bathroom.