11/05/2020
*Texture is done in the hallways and most apartments. First coat of paint is on the walls in the stairwells.
*Back parking lot is mostly complete, still need to cut some small trees down and clean up to prepare to put the fence and gravel in.
*Roof has the fibered aluminum roof coating put on as well, which was a big project to get done before winter.
*back stairwell is getting framed in. Will add windows to match each level. The inside is actually painted to a color that looks like concrete. Kind of a beige gray.