Backfilling

Floor 2 brickwork going up
26/02/2020

Floor 2 brickwork going up

2nd floor brickwork underway
14/02/2020

2nd floor brickwork underway

Roof Trusses and asbestos sheeting being fitted.
20/12/2019

Roof Trusses and asbestos sheeting being fitted.

Pouring 55 Cubes of 25MPA concrete for conventional decking using a pump and power floating
15/12/2019

Pouring 55 Cubes of 25MPA concrete for conventional decking using a pump and power floating

Block  and beam decking
13/12/2019

Block and beam decking

Steel being fitting for conventional decking. Beam in the middle
12/12/2019

Steel being fitting for conventional decking. Beam in the middle

Home extension, additional room + slab and two rooms above . Brickwork complete and ready for slab to be installed.
08/12/2019

Home extension, additional room + slab and two rooms above . Brickwork complete and ready for slab to be installed.

Plastering complete. Deck plates and deck props being setup for conventional decking to be poured
08/12/2019

Plastering complete. Deck plates and deck props being setup for conventional decking to be poured