18/09/2026
The building reflects strong attention to fine finishing details ποΈβ¨
* The horizontal plaster lines are evenly spaced and consistently aligned across both floors π
* Window and door mouldings are straight, sharp and well defined πͺπͺ
* The concrete window sills project outward to help direct rainwater away from the walls π§οΈ
* The walkway slab has a clean, straight edge, with a smoothly plastered underside β
* The roofline moulding is continuous and neatly aligned along the entire building π
* The upper and ground-floor openings align well, creating a balanced appearance π
* The staircase has been carefully shaped and plastered, with the final balustrade and finishes still to follow πͺ
* The long passage provides clear access to every unit, with paving and drainage forming part of the next phase πΆπ½ββοΈ