There are a lot of important details happening before they ever become visible in the finished home.
Before backfill is the right time to prepare for exterior landscaping, driveway gates, pool services, and other underground requirements. We also take advantage of having the large excavation equipment on site to prepare for driveways, sidewalks, and other concrete surfaces—saving time, work, and cost later.
Now we’re at lock-up, with the Siga Majvest 500 WRB being installed by Elite Airtight Envelopes and our Euroline Windows installed. Planning ahead, keeping the site organized, and getting the details right early are all part of building the right way.
Built the right way. The Clay Way.
Builder: Clay Construction Custom Homes
Architectural and Interior Designer: Sarah Gallop Design
Excavation: Hubert Regehr
Building Envelope: Elite Airtight Envelopes
Air control layer products: SIGA North America & Etienne Gubler
Windows: EuroLine Windows
Painting: Elliott McGregor
Stone: Jamie Beaton - 6042302256
Finish Carpenter: timco.fine.carpentry
Pool Supplier and Installer: Blue Orca Pools
Driveway Gate: Avant Guard Gates
Garage Doors: Doorcare Garage Doors Lower Mainland
Landscaping:
Exterior Cladding & Siding: Seawall Exteriors LTD.
Electrical: