04/04/2026
A very "good" friday ๐ฃ๐ฅ๐ฐ. A change from our usual ๐ฅ๐พ. Using our time productively to work on the latest temporary kitchen pod, getting ready for hire from mid April.
Update so far:
๐kitchen units installed โ๏ธ
๐flooring fitted โ๏ธ
๐worktops fittedโ๏ธ
๐wall panels dry fittedโ๏ธ
๐sink, tap and hob installed โ๏ธ
Ready for electrics, lighting and plumbing before heading off for graphics.
Big thanks to Wellesley Installations for putting in the graft to help me get to this point.
If you're planning a kitchen or house renovation don't struggle to maintain a routine, hire a Hive BoxPods and save on takeaways, eating out and stress! ๐๐๐๐๐๐