Utility & Transmission Survey Solutions Ltd

Utility & Transmission Survey Solutions Ltd Providing Survey solutions, from drone based 3D point clouds, photogrammetry, volumetric , 3D laser

Primarily a survey, design and engineering consultancy company within the electrical distribution business. With its roots and office in the Midlands region, giving easy access to the motorway network to be able to provide the required expertise through the whole of the UK. Utility & Transmission Survey Solutions was formed in 2013 to provide expertise advice and design solutions to the local distribution network operators on their aging overhead line network systems through innovative use of modern software and survey equipment. We provide a complete package from initial concept to build plans through to actual project management during the build if required

UTSS UTILITY TRANSMISSION SURVEY SOLUTIONS: From the air to underground and all in between. With over 30 years in the en...
02/10/2026

UTSS UTILITY TRANSMISSION SURVEY SOLUTIONS: From the air to underground and all in between.

With over 30 years in the energy sector, we pride ourselves on integrity, responsibility, and an expert understanding of our clients' needs. While our roots are in electrical engineering, we provide comprehensive solutions across construction, utility services, rail networks, and quarries.

At UTSS, we utilise the latest technologies, from traditional surveying methods to 3D laser scanning and UAV’s which offer bespoke surveys and mass data capture that some traditional methods do not allow.

Our core services:
◽ Overhead Line survey and design
◽ Underground Utility Mapping
◽ UAV Survey & Inspection
◽ Topographical Surveys
◽ Architecture and Residential
◽ Volumetrics and Setting Out

For survey help with your next project:
01782 785837
[email protected]

Baseline surveys and site preparation underway in Heysham (near Morcombe) for Askam Civil Engineering's mobilisation wor...
29/09/2026

Baseline surveys and site preparation underway in Heysham (near Morcombe) for Askam Civil Engineering's mobilisation works for the first stage of a solar project.

To safeguard an underground culvert running beneath the main access road, we were tasked with delivering pre and post-construction condition surveys.

We cleared back heavy overgrown vegetation at both ends of the culvert, opening up access for our supply partner, Clearflow Surveys, to carry out a comprehensive CCTV inspection. A follow-up survey at the end of the project will ensure the structure remains completely sound after heavy plant movements.

We're busy conducting utility clearance for AMB Rail ahead of a directional drilling project along the A11 near Snettert...
26/09/2026

We're busy conducting utility clearance for AMB Rail ahead of a directional drilling project along the A11 near Snetterton.

Using our Leica DS4000 GPR unit, we map buried infrastructure along the planned drill path, providing accurate subsurface data so the drill team can execute the bore safely and without risk to existing services.

Work is underway to restore the historic stonework at John Smith’s Brewery in Tadcaster (est. 1758).Triton Construction ...
23/09/2026

Work is underway to restore the historic stonework at John Smith’s Brewery in Tadcaster (est. 1758).

Triton Construction has been brought in to manage the repairs, which require building a substantial scaffold along the building's elevation. To ensure the scaffolding's load-bearing requirements don't compromise underground infrastructure, we were called in to carry out a comprehensive utility survey.

Using non-destructive scanning equipment, our team traced and mapped the below-ground services across the footprint. We are adding physical ground markings on-site and producing a topographical map with overlaid underground utilities and associated depths to guide safe scaffolding setup.

We are proud to support essential pre-construction planning for a piece of local heritage.

Call-out at 2:30 pm. On site by 7:30 pm. Wrapped by 1:15 am. When a civils team opened up the pavement to install a new ...
18/09/2026

Call-out at 2:30 pm. On site by 7:30 pm. Wrapped by 1:15 am.

When a civils team opened up the pavement to install a new storm drain for Space Station’s refurbished building, they hit an unexpected snag: a dense nest of unmapped cables and pipes right in the path of the new drainage line.

Work had to pause until the area could be fully surveyed, and fast.

We joined the project that same evening to map all underground utility assets. Working under a strict Highways Opening Notice (8:00 pm – 6:00 am), every barrier and trench had to be clear and temporarily backfilled before morning traffic hit.

By 1:15 am, the survey data was captured. The client's drainage engineer now has the accurate underground picture needed to review installation levels and keep the project moving safely.

Fast response. Zero guesswork.

Overhead line surveying isn't always in open fields. 🌳  🌳 🐑On a recent 33kV line project in Bury, we were brought in to ...
15/09/2026

Overhead line surveying isn't always in open fields. 🌳 🌳 🐑

On a recent 33kV line project in Bury, we were brought in to record detailed site data ahead of a terminal pole replacement.

When the surrounding site was developed years ago, stone gabion baskets were installed around the structure to raise the ground level, making access tight and altering ground clearances.

Using highly accurate GNSS survey equipment, we mapped the precise ground contours, gabion structures, and pole positions. This data can be used to create full overhead line profile, sag, and clearance drawings to ensure the replacement pole meets exact safety standards

Precision mapping before the drill hits the ground. We are on site near the A14, just outside Felixstowe, and are undert...
08/09/2026

Precision mapping before the drill hits the ground.
We are on site near the A14, just outside Felixstowe, and are undertaking a comprehensive utility clearance survey on both sides of the dual carriageway.

Before any directional drilling can safely begin, accurate underground mapping is essential.

Directional drilling is a trenchless, low-impact method for installing utilities without disrupting major transport routes. However, its success relies entirely on knowing exactly what lies beneath the surface before work starts.

Our team is using ground-penetrating radar (GPR) and electromagnetic location equipment to trace, identify, and mark existing buried assets.

By clearing the path first, we ensure the upcoming directional drilling team can operate with total confidence, minimising the risk of utility strikes, protecting vital infrastructure, and preventing project delays.

Swinging the mallet to mark the spot. 🔨When a line design changes, clear field marking is everything. On our current 10k...
04/09/2026

Swinging the mallet to mark the spot. 🔨

When a line design changes, clear field marking is everything. On our current 10km refurbishment project, we took on the section from pole 46 to 96, a stretch that required route changes to the existing line to accommodate landowner and network requirements.

Every peg driven in represents a precise new pole location ready for the next phase. Good groundwork saves time, hassle, and guesswork down the line.

UTSS have been out in Lincolnshire working on the National Grid Electricity Distribution overhead line refurbishment sch...
02/09/2026

UTSS have been out in Lincolnshire working on the National Grid Electricity Distribution overhead line refurbishment scheme between Grantham and Skillington.

Before the heavy equipment rolls in, the path has to be mapped with precision. Proper prep and clear marking now mean a smooth process for the crew implementing the new line.

Mapping the 10km route is thoroughly underway.

Up and out early today! Thursdays start with attending the weekly meeting of the Macclesfield chapter of BNI.I’ve been a...
27/08/2026

Up and out early today! Thursdays start with attending the weekly meeting of the Macclesfield chapter of BNI.

I’ve been a member for many years and find this style of networking incredibly beneficial to our business. Today, I had the opportunity to present to the room on all things UTSS: what we do, how we deliver, and the key sectors we support.

Address

Tawney Close
Stoke-on-Trent
ST74EN

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+441782785837

Alerts

Be the first to know and let us send you an email when Utility & Transmission Survey Solutions Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Utility & Transmission Survey Solutions Ltd:

Shortcuts

Share

Category