So much been going on over the last few weeks on the new build job, plastering, 2nd fix joinery, plumbing, electrics, tiling, groundworks and even fencing. Loads and loads of fencing. Looking good though, last bit of plastering left to do next week and then kitchen and final fix can be done. Tiling about done ready for the bathrooms going in. There have been patios and paths laid, soil brought in. And even got the tarmac on the driveway ready for the new owners. Not long left on this beast of a project now. as always with thanks to my team and also PGL Plumbing and Heating Harrison Keenaghan Construction