11/13/2026
The first tiebacks go in.
Part 5 of our Rancho Palos Verdes landslide repair. This property lost about 150 feet of backyard to the slide. All 17 caissons are in and phase two is underway: excavate, install the anchor block, then install the tiebacks.
Each tieback is drilled down at a 30 degree angle and runs 130 feet back under the house into stable ground. Every one ties to a caisson after it passes through the grade beam, which gets poured next. Lagging goes in against the beams to hold the soil back and keep the crew safe while we dig.
Levine Homes Real Estate and Construction. Custom home builder in Hermosa Beach and the South Bay. CSLB B-985034, DRE 01928630.
Dealing with a slope or landslide in Rancho Palos Verdes? Call (310) 796-9088.