06/11/2026
The foundation mat slab is officially complete.
Getting to this stage took far more than a concrete pour. We started with piles, including breaking through rock to achieve the required depths, followed by excavation, underground plumbing, building risers, and extensive rebar installation. Every step was inspected and approved before moving forward.
More than 25 concrete trucks later, the foundation that will support this entire building is in place. The difficult underground work is now behind us, and from this point forward, the project will begin rising out of the ground much faster.
This is the part of construction you rarely see, but it’s the work that makes everything above possible.
•
•
•🏆
•🏠
•
•