Arnold Clark, Northwich, Demolition & Groundworks
We recently completed demolition and groundworks at our client Arnold Clark’s Northwich site, removing an existing valet bay structure and transforming the area with a new tarmac finish.
The works involved the controlled dismantling and removal of the existing steel framed structure, including internal timber studwork and steel cladding. Electrical services were safely isolated and removed prior to demolition.
Following removal of the structure, the area was excavated and prepared, with the sub base rebuilt using compacted MOT Type 1 aggregate. Approximately 40mm of hot laid tarmac was then installed and seamlessly tied into the existing surface.
We also made good areas affected by drainage works, leaving the site with a durable, level and professionally finished surface.