kimberly.conderino_re

kimberly.conderino_re On the X Team @ Real Broker CT (New London) LLC 🏡 I'm looking forward to serving your needs in this real estate market.
(1)

I'm a lifelong resident of Southeastern CT🙂 and looking forward to being your resource for any real estate needs.

What a crazy situation …met Elliot on a Monday and we were under contract by Thursday in the same week. Lots of roller c...
06/18/2026

What a crazy situation …met Elliot on a Monday and we were under contract by Thursday in the same week. Lots of roller coasters on this one but closed on the planned closing day and had the honor of handing over the keys to this beautiful home that he fell in love with immediately after walking into it. Many blessings to you and this home and many memories to come 🙌

A bittersweet time to sell my son’s house.
06/03/2026

A bittersweet time to sell my son’s house.

05/17/2026

Open house 30 more minutes…43 Church Hill Rd. Ledyard

05/15/2026

And just like that, we are under contract!🙌🏼🏡🪧🖊️✍️
Met on Monday- Under Contract my Thursday afternoon Team effort with Dorothy Satti at Gateway Mortgage 🙌🏼

05/15/2026

IMPORTANT TRAFFIC ALERT: Gold Star Bridge I-95 Project Update

Major Lane Configuration Change Coming May 30-31, 2026

The Connecticut Department of Transportation's Gold Star Bridge project is reaching a critical milestone that will impact I-95 travel for the next four years.

OVERNIGHT WORK - SATURDAY, MAY 30TH:

When: Saturday, May 30th, 8:00 PM through Sunday, May 31st, 8:00 AM

What: Installation of the I-95 Northbound Crossover

Impact: Lane closures on I-95 Northbound during this 12-hour window

This date was strategically selected based on the lowest expected traffic volumes and to provide contractors the maximum time needed to complete extensive roadway modifications safely.

NEW PERMANENT TRAFFIC PATTERN - BEGINS MAY 31ST:

Starting Sunday, May 31, 2026, a new four-year traffic configuration will be in effect:

I-95 Northbound Traffic:

· Through Traffic (continuing north): Use 2 lanes that will cross
over to the southbound bridge
· Local Traffic (New London/Downtown Groton): Use 2 lanes
remaining on the existing northbound bridge

Exit Access Changes:

· Exit 86: Accessible ONLY via the I-95 crossover lanes
· Exit 85: Accessible ONLY via the existing northbound bridge
local lanes

PLAN AHEAD:

✅ Know your destination before entering I-95 NB in this area
✅ Allow extra travel time as drivers adjust to the new
configuration
✅ Pay attention to signage directing through vs. local traffic
✅ Avoid the area Saturday night/Sunday morning if possible
during construction hours

Thank you for your patience as we all work together to improve our infrastructure.

Some days I have to just sit in the office to do work so I will not be distracted from housework🙌🏼😆
05/11/2026

Some days I have to just sit in the office to do work so I will not be distracted from housework🙌🏼😆

05/11/2026

Day 43 on building a new home -lot is sold -now just waiting for the town approvals to get started

So grateful for the wonderful offers this past weekend on two amazing homes. Time for changes in both their lives. One c...
05/06/2026

So grateful for the wonderful offers this past weekend on two amazing homes. Time for changes in both their lives. One couple to move near their daughter and grandchildren, while another just on to a different stage of life in a smaller home. 🙃😃

What a crazy week! So many showings and one home under contract, one tomorrow and still able to pick tulips with my daug...
05/05/2026

What a crazy week! So many showings and one home under contract, one tomorrow and still able to pick tulips with my daughter and grands🥰

Address

New London, CT
06320

Alerts

Be the first to know and let us send you an email when kimberly.conderino_re posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category