JATA Construction

JATA Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from JATA Construction, 1b paardeberg Road, Bodmin.

JATA Construction provides a high quality build no matter how big or small the job is, And prides itself on the aftercare and friendships it forms with all of its clients.

Jerome and the team are making good progress over at our project in Bozeat, near Wellingborough, where we’re converting ...
10/09/2026

Jerome and the team are making good progress over at our project in Bozeat, near Wellingborough, where we’re converting an old building into five one-bedroom homes.

The old single-pane metal Crittall-style windows are now being replaced with new double-glazed windows as we work our way through the next stage of the build.

There’s a fair bit of history behind this building, Arch Villa dates back to around 1870 and was once part of Northamptonshire’s world-famous boot and shoe industry. Historical records identify the site as a former shoe factory and offices, while local accounts link it to pioneering shoemaker John Drage, who played a part in Bozeat’s transition from an agricultural village into a thriving manufacturing community.

More than 150 years later, Arch Villa is changing again whilst honouring the past and creating homes for the future.

Concrete delivery, coastal edition.Foundations prepped and poured for one of our Cornwall projects, with a fair run from...
10/09/2026

Concrete delivery, coastal edition.

Foundations prepped and poured for one of our Cornwall projects, with a fair run from the concrete wagon down to where we actually needed it.

Not the easiest location for a pour, but a well-supported pumping line kept everything moving. Great service from Faheys concrete as always.

An early trip up from Cornwall for Rob and Daniel today, heading to Waltham Abbey to join Dennis and see the latest prog...
08/09/2026

An early trip up from Cornwall for Rob and Daniel today, heading to Waltham Abbey to join Dennis and see the latest progress on the new GAP depot we’re building.

Things are moving on quickly, with the concrete floor slabs down, the first-floor structure taking shape and the Kingspan QuadCore cladding starting to arrive.

It was good to spend some time with the GAP team while everyone was together, walking through progress and talking about what’s coming up over the next few weeks.

Getting that time together on site is always valuable, both with GAP and between our own Construction, Connections and Designs and regional teams. You can sort a lot around a table, but sometimes you need to be stood on the job, looking at it together.

Kingspan Insulation UK
JATA Designs
JATA Connections

02/09/2026
Yesterday Andy Burnham stood in the House of Commons for the first time as Prime Minister and set out his plans for grow...
02/09/2026

Yesterday Andy Burnham stood in the House of Commons for the first time as Prime Minister and set out his plans for growth across Britain but one line really stood out to us. The Government has acknowledged that Cornwall “lacks a basic level of infrastructure which in turn harms growth.”

And although Cornwall has been singled out here, this definitely isn’t just a Cornish problem. Across the country, the construction industry is being asked to deliver more homes, more commercial development, more public infrastructure and ultimately, more growth but someone has actually got to build it.

We can set ambitious housing targets and encourage businesses to invest, but if the roads, utilities, grid connections and wider infrastructure aren’t there to support that development, how are we realistically going to deliver what’s being asked of us?

And it’s not just the physical infrastructure. We also need to look at the amount of red tape involved in getting projects off the ground - yes there absolutely needs to be proper process and regulation, but it has to work if we want to build more and grow faster, we can’t keep making it harder and slower to actually get things moving.

We see these challenges every day - we don’t lack good contractors and we don’t lack businesses willing to invest but if the Government wants Britain to build, they need to make sure the infrastructure - and the system around it - actually lets us build.

600 x 600mm foundations set out and completed for an extension in Mid Cornwall.Working alongside the existing property r...
01/09/2026

600 x 600mm foundations set out and completed for an extension in Mid Cornwall.

Working alongside the existing property required careful detailing to ensure the new foundations were properly integrated.
Additional underpinning was required to sections of the existing property where the original foundations needed further support to accommodate the new works. Letterbox shuttering was used to allow the concrete to be poured right up beneath the existing structure, leaving the required gap for dry packing.

Once the concrete had cured, the blockwork, services and beam-and-block floor were installed, ready for the next stage.
This extension will create a valuable additional space for the property.

29/08/2026

Really good to see this being addressed by the Prime Minister. The majority of builders in this country are reputable businesses, employing good people, paying suppliers and taking genuine pride in the work they deliver. Anything that gives customers greater confidence while helping those businesses stand apart from the minority who damage the reputation of our industry, is welcome.
We just need to ensure the system works both ways - protecting customers, while also protecting reputable contractors and ensuring they’re paid fairly for work properly delivered.

28/08/2026

We went back to this project in North Cornwall recently to see how it was looking.

Originally two semi-detached properties, the project involved retaining the existing structure on one side while completely rebuilding the adjoining property from the ground up.

A technically challenging build at times, but one our team’s experience in working with existing structures was well suited to.

Sometimes a client knows exactly what they want something to look like, but planning dictates the material or appearance...
27/08/2026

Sometimes a client knows exactly what they want something to look like, but planning dictates the material or appearance we need to work with and that’s where we can explore it a bit further.

It might be a particular timber cladding that’s required to satisfy planning, but the client wants a slightly different finish. We can look at the options, work through the detail and find a way of achieving what’s required, while making sure what we install still meets the planning requirements.

Having skilled craftsmen on site gives us the ability to adapt and do this when needed, and with JATA Designs working alongside us, we can look at it from both sides to make sure what happens on site meets what’s required by planning.

Mannok PIR insulation installed, with all gaps carefully sealed using expanding foam and joints finished with aluminium ...
26/08/2026

Mannok PIR insulation installed, with all gaps carefully sealed using expanding foam and joints finished with aluminium foil tape.

Mannok PIR offers high thermal performance with a low thermal conductivity as low as 0.022 W/mK depending on the product, helping achieve strong U-values without excessive insulation thickness.

But good insulation is only as good as the installation. Taking the time to close gaps and properly seal the joints helps maintain continuity across the insulation layer and gives the quality finish we expect on site.

It’s the details you won’t necessarily see when the job is finished that matter.

Great product, properly installed by our team on site in Cornwall. IYKYK. 👌

Address

1b Paardeberg Road
Bodmin
PL311EY

Alerts

Be the first to know and let us send you an email when JATA Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share