08/09/2026
The Hobson Bay boardwalk, stage 4 of the Te Ara ki Uta ki Tai project.
The closing link from Ōrākei Road to Tāmaki Drive, connecting pathways around the bays and into the city centre. This final stage of the project involved working from two ends and setting out 48 column positions over a distance of 870 metres. It was a well-deserved pat on the back recently when the final girders were placed and met perfectly. The concrete boardwalk runs along the banks of the Hobson Bay estuary and we’ve enjoyed being an integral part of this notable build with HEB Construction and Auckland Transport
www.AT.govt.nz/easternpath